Flood Control and Drainage18NH0065

CONSTRUCTION OF DIKE REVETMENT ALONG TANDAG RIVER BASIN PROTECTING THE TANDAG BRIDGE, TANDAG CITY, SURIGAO DEL SUR

CONSTRUCTION OF DIKE REVETMENT ALONG TANDAG RIVER BASIN PROTECTING THE TANDAG BRIDGE, TANDAG CITY, SURIGAO DEL SUR is a DPWH-tracked public work in Surigao del Sur 1st DEO, Region XIII. Reported contract value: ₱27,931,042.38. Status: Reported complete (DPWH). Contractor on record: LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST. Figures trace to dpwh.

Surigao del Sur 1st DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱30,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-LGRCB-18-0020376 · ₱7,000,000 · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18NH0065 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-10-02 → 2025-09-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Surigao del Sur

Based on the coordinates published with the DPWH record and NOAH file SurigaoDelSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF DIKE REVETMENT ALONG TANDAG RIVER BASIN PROTECTING THE TANDAG BRIDGE, TANDAG CITY, SURIGAO DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dike Revetment along Tandag River Basin Protecting the Tandag Bridge, Tandag, Surigao del Sur
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-LGRCB-18-0020376

₱7,000,000.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

304 projects · ₱17.1B total · 2 flags

4. Implementation

Contract Amount

₱27,931,042.38

Progress

Reported complete (DPWH)

Start Date

May 2, 2018

Target End

February 22, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del SurCity of TandagRosario
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Ewiniar 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.