Flood Control and Drainage25G00061

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN SAN ENRIQUE, ILOILO (PACKAGE 6)

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN SAN ENRIQUE, ILOILO (PACKAGE 6) is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱144,272,080.22. Status: Past target date (DPWH On-Going). Contractor on record: ROPRIM CONST CORP FORMERLY ROPRIM CONST 8546. Figures trace to dpwh.

Region VI, Region VI
Region: Region VI

Satellite images processing — before/after tiles will appear here after the next batch run.