CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN SAN ENRIQUE, ILOILO (PACKAGE 6)
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN SAN ENRIQUE, ILOILO (PACKAGE 6) is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱144,272,080.22. Status: Past target date (DPWH On-Going). Contractor on record: ROPRIM CONST CORP FORMERLY ROPRIM CONST 8546. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
