Rehabilitation / Major Repair of Flood Control Structure23HO0228

Repair/ Rehabilitation/ Reconstruction of Montañeza River Flood Control System (Upstream-Section 1), Malabuyoc, Cebu

Repair/ Rehabilitation/ Reconstruction of Montañeza River Flood Control System (Upstream-Section 1), Malabuyoc, Cebu is a DPWH-tracked public work in MALABUYOC (CEBU), CEBU, Region VII. Reported contract value: ₱94,315,929.32. Status: Reported complete (DPWH). Contractor on record: JTC CRUZ CONST CO INC / NEWBIG FOUR J CONST INC FORMERLY FOUR J. Figures trace to sumbong.

MALABUYOC (CEBU), CEBU, Region VII
Region: Region VII

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱35,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱91,914,553 · NEWBIG FOUR J CONSTRUCTION .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-04-14 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Cebu

Based on the coordinates published with the DPWH record and NOAH file Cebu.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Repair/ Rehabilitation/ Reconstruction of Montañeza River Flood Control System (Upstream-Section 1), Malabuyoc, Cebu

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Mainit River Flood Control Structure, Naga City, Cebu
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cebu 7th District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱91,914,553.11 · NEWBIG FOUR J CONSTRUCTION .

Award / contract ref: 23HO0228

4. Implementation

Contract Amount

₱94,315,929.32

Progress

Reported complete (DPWH)

Start Date

August 10, 2023

Target End

June 8, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuMalabuyocMontañeza
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.