Barangay
Centro I
Centro I, Sanchez Mira, Cagayan, Region II (Cagayan Valley). Urban. Population 2,415 (2024 POPCEN).
PSGC 0201522003 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Centro I
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
19 records · ₱468,694,064.52
- Construction of Sanchez Mira Flood Control Structure Along Sanchez Mira River, Sanchez Mira, Cagayan₱96,500,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers - Construction of Sanchez Mira Flood Structure A₱71,997,432.14 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Mitigation Structure-Construction of Sanchez Mira Flood Control, Sanchez Mira, Cagayan₱50,258,165.00 · 2019 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure and Reliable Road System - Replacement of Permanent Weak Bridge-Sanchez Mira (B01010lz) Along Manila North Rd, Sanchez Mira, Cagayan₱49,000,000.00 · 2021 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Nangoluan Flood Control Structure Along Sanchez Mira River, Sanchez Mira, Cagayan₱49,000,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Sanchez Mira Flood Control Structure Along Sanchez Mira River, Sanchez Mira, Cagayan₱48,248,286.07 · 2024 · medium confidence (project coordinates inside the barangay boundary)
How linked: 19 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Centro I itself. This shows the municipality figure for Sanchez Mira.
1 record · ₱289,088,116.28
- Municipality of Sanchez Mira, Cagayan₱289,088,116.28 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Centro I itself. This shows the province figure for Cagayan.
54,415 records · ₱160,599,761,513.05
54,357 placed at Cagayan level itself; the rest in LGUs under it.
- Cagayan₱160,599,761,513.05 · 54,357 awards · high confidence (area of delivery is this province only)
- Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Isabela, Pampanga, Tarlac₱112,839,000.00 · 2 awards · low confidence (area of delivery lists several provinces)
- Bohol, Bukidnon, Bulacan, Cagayan₱26,967,830.69 · 1 awards · low confidence (area of delivery lists several provinces)
- Bulacan, Cagayan₱12,244,267.53 · 2 awards · low confidence (area of delivery lists several provinces)
- Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Pampanga, Tarlac₱9,570,790.00 · 4 awards · low confidence (area of delivery lists several provinces)
- Bataan, Batanes, Batangas, Benguet, Biliran, Bohol, Bukidnon, Bulacan, Cagayan, Camarines Norte₱8,259,635.30 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 54,357 by area of delivery is this province only; 58 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Centro I itself. This shows the municipality figure for Sanchez Mira.
8 records · ₱134,000,000.00
- Small Water Impounding Project: Construction of Small Water Impounding Project (Santor-Langagan Communal Irrigation System - Phase 1) in Sanchez Mira, Cagayan₱50,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Small Water Impounding Project: Construction of Small Water Impounding Project (Santor-Langagan Communal Irrigation System - Phase 2) in Sanchez Mira, Cagayan₱50,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Local Road: Concreting of Local Access Road in Barangay Dagueray, Sanchez Mira₱10,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Local Road: Improvement of Local Access Road in Barangay Masisit, Sanchez Mira₱10,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Repair and Improvement of Public Market₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
How linked: 8 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
1 record · ₱3,000,000.00
- Construction of Multi-Purpose Building in Pasalubong Center, Brgy. Centro I, Sanchez Mira, Cagayan₱3,000,000.00 · 2019 · medium confidence (GAA line text names the place)
How linked: 1 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Duplicate or Near-Duplicate ProjectsConstruction of Sanchez Mira Flood Control Structure Along Sanchez Mira River, Sanchez Mira, CagayanContractor: Tjmt Const / Jeicca Builders
- Duplicate or Near-Duplicate ProjectsConstruction of Sanchez Mira Flood Control Structure Along Sanchez Mira River, Sanchez Mira, CagayanContractor: Ocp Const
- High Concurrent Workload for One ContractorEgb Const Corp Formerly: Egb ConstContractor: Egb Const Corp Formerly: Egb Const
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 10 contractors on DPWH projects linked to Centro I and the LGUs under it. Click a column to sort.
| Jll Pulsar Const CORP Formerly: Pulsar Const | 4 | ₱118,917,419.68 | 0 |
| Tjmt Const / Jeicca Builders | 1 | ₱96,500,000.00 | 1 |
| Ocp Const | 7 | ₱74,713,639.91 | 1 |
| Oliva Design And Const | 1 | ₱71,997,432.14 | 0 |
| Tjmt Const / Ramike Const | 1 | ₱49,000,000.00 | 0 |
| Egb Const CORP Formerly: Egb Const | 1 | ₱24,500,000.00 | 1 |
| Ed1son Development | 1 | ₱16,070,138.64 | 0 |
| Dandex Const | 1 | ₱9,075,434.15 | 0 |
| J G Yacas Const Supply And Equipment Rental | 1 | ₱4,950,000.00 | 0 |
| J B Alcantara Builders | 1 | ₱2,970,000.00 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in Cagayan
BIR publishes collections by province and city, not by town or barangay. Centro I is in Cagayan.
BIR does not publish a separate figure for Cagayan. Its collections are reported together with Batanes: ₱4.15 billion combined, January-August 2026.
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities