Barangay
Talisayan
Talisayan, City of Zamboanga, Region IX (Zamboanga Peninsula). Urban. Population 15,463 (2024 POPCEN).
PSGC 0931700084 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Talisayan
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
38 records · ₱1,422,511,845.22
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Extension of Flood Control at Saaz River, San Ramon, Zamboanga City₱111,098,468.77 · 2020 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure at Saaz River, San Ramon Bridge 2, Along Zamboanga City-Labuan-Limpapa Road (S01185mn) San Ramon, Zamboanga City₱101,222,107.63 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure at Saaz River, San Ramon Bridge 1 Along Zamboanga City-Labuan-Limpapa Road (Pca Section), Zamboanga City₱100,311,469.41 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Widening of San Ramon Bridge 2 (B01162mn) Along Zamboanga City - Labuan - Limpapa Road, P00117212mn, Zamboanga City, Beg. of Proj. 1959+840.00, Abutment A 1959+852.58, Abutment B 1959+944.92, End of Proj. 1959+960.00, Approaches Net Length: 27.66 Ln.M.,₱95,465,458.61 · 2017 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure at Saaz River Along San Ramon Br. 2 Along Zamboanga City-Labuan-Limpapa Secondary Road, Talisayan, Zamboanga City₱89,083,475.33 · 2021 · medium confidence (project coordinates inside the barangay boundary)
- Road Widening - Secondary Roads - Zamboanga City-Labuan-Limpapa Rd - K1955 + 700.00 - K1957 + 644.00₱88,399,428.42 · 2024 · medium confidence (project coordinates inside the barangay boundary)
How linked: 38 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱4,238,120.50
- Barangay Talisayan, Zamboanga City, Zamboanga del Sur₱4,238,120.50 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Talisayan itself. This shows the region figure for Region IX (Zamboanga Peninsula).
160,555 records · ₱271,202,033,477.96
How linked: 160,555 by area of delivery is this province only.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Talisayan itself. This shows the city figure for City of Zamboanga.
8 records · ₱188,500,000.00
2 placed at City of Zamboanga level itself; the rest in LGUs under it.
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱153,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction of Children'S Park at Sta. Catalina₱10,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Solar Powered Street Lighting at Lumayang, Zamboanga City₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Solar Powered Street Lighting at Lapakan, Zamboanga City₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Solar Powered Water System With Filtration₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Solar Powered Street Lighting at Lumbangan, Zamboanga City₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 8 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
2 records · ₱45,000,000.00
- Construction of Multi-Purpose Building, Labuan Hospital, Zamboanga Ecozone, Barangay Talisayan, Zamboanga City, Zamboanga del Sur₱40,000,000.00 · 2023 · medium confidence (GAA line text names the place)
- Construction of Multi-Purpose Building, 9 Rsu Training Center, Zamboanga Ecozone, Barangay Talisayan, Zamboanga City, Zamboanga del Sur₱5,000,000.00 · 2023 · medium confidence (GAA line text names the place)
How linked: 2 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Awards Very Close to the Budget CeilingConstruction of Flood Control at Saaz River, San Ramon, Zamboanga City, Zamboanga del SurContractor: Jm2k Const
- Contractor Concentration (Flood Control)Badsbro Const and Gen MerchandiseContractor: Badsbro Const and Gen Merchandise
- High Concurrent Workload for One ContractorSt Timothy Const CorpContractor: St Timothy Const Corp
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 27 contractors on DPWH projects linked to Talisayan and the LGUs under it. Click a column to sort.
| Altos Const | 3 | ₱230,659,931.36 | 0 |
| Jm2k Const | 3 | ₱107,471,871.53 | 1 |
| St Timothy Const CORP | 1 | ₱101,222,107.63 | 1 |
| Bendimil Const | 1 | ₱95,465,458.61 | 0 |
| Altos Const / Grace Const CORP | 1 | ₱89,083,475.33 | 0 |
| Benram Const | 1 | ₱88,399,428.42 | 0 |
| Teddie Const Development INC | 4 | ₱85,424,505.73 | 0 |
| Alraf Const And Ent INC Formerly:Alraf Const | 1 | ₱67,221,309.56 | 0 |
| Rcdg Const CORP | 1 | ₱48,817,868.25 | 0 |
| Long Island Builders | 2 | ₱48,788,537.48 | 0 |
| A C Rivero Development CORP | 2 | ₱48,540,876.46 | 0 |
| Badsbro Const And Gen Merchandise | 1 | ₱45,834,844.58 | 1 |
| Rabbit Const | 1 | ₱45,530,000.00 | 0 |
| Mcgabriel Const / Aquaterra Konstrukt INC | 1 | ₱41,992,237.57 | 0 |
| Mcgabriel Const | 2 | ₱40,068,619.27 | 0 |
| Rjlp Const And Supplies | 1 | ₱39,780,445.91 | 0 |
| Jamari Const Formerly Frae Const | 1 | ₱39,149,673.29 | 0 |
| Dansburg Macro-Builders INC | 1 | ₱29,399,535.35 | 0 |
| Ed1son Development | 1 | ₱29,207,731.86 | 0 |
| Mother'S Role Const | 2 | ₱20,727,554.76 | 0 |
| Aej Hardware Const | 1 | ₱19,359,513.44 | 0 |
| Victer Const And Development Opc | 1 | ₱19,244,591.04 | 0 |
| Sbr Const And Ent | 1 | ₱15,155,712.10 | 0 |
| M S D L R Const | 1 | ₱14,258,307.75 | 0 |
| Citywest Builders And Supply | 1 | ₱4,949,998.54 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in City of Zamboanga
BIR publishes collections by province and city, not by town or barangay. Talisayan is in City of Zamboanga.
₱3.19 billion
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Talisayan
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
