4RMCONSTRUCTION is listed as a company organization in Philippine public procurement records on this site, with 17 linked DPWH project(s) totaling about ₱174,149,795.54. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
4RMCONSTRUCTION
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 17
- Total value
- ₱174,149,795.54
- Published flags
- 0
- Region
- Baguio City DEO · Cordillera Administrative Region
Public Record Grade
A transparent, data-derived summary of reported public records for 4RMCONSTRUCTION — not an accusation or finding of wrongdoing.
Score: 80.10 / 100 · Projects in sample: 17 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 73.5
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 8
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 17
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 17
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 17
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 17
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 17
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
16 geotagged projects — Open full map · Download projects (CSV)
- NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS-TERTIARY ROADS JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD ROAD. CHAINAGE 4,685-CHAINAGE 5,27520PM0003 · ₱22,770,700.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - (S04030LZ) CHAINAGE 3415 - CHAINAGE 401522PM0012 · ₱21,560,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS - TERTIARY ROADS, JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - (S04030LZ) CHAINAGE 4015 - CHAINAGE 468521PM0009 · ₱19,396,415.95 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS, BESAO-TUBO (VIA TAMBOAN) ROAD, MT. PROVINCE SECTION, MOUNTAIN PROVINCE20PI0019 · ₱19,000,062.73 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SPECIFIC LOCATION ALONG CITY LIMIT - STO. TOMAS ROAD (S00404LZ), K0262+532 - K0263+412, TUBA, BENGUET20PE0031 · ₱16,170,000.00 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY RDS, AGOO-BAGUIO CITY RD, K0240+934-K0241+234, TUBAO, LU23AF0010 · ₱14,497,010.70 · mapped
- NETWORK DEVT-IMPVT/WIDENING OF NATL RDS, SEC RDS, DANTAY-SAGADA RD17PI0017 · ₱13,322,598.47 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - MT. PROVINCE - IFUGAO RD (KILING-PARACELIS SECT.) K0456+(-697) - K0456+(-086)23PM0012 · ₱10,783,541.62 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS: MAGSAYSAY AVE. (TRINIDAD RD.) - K0251+(-463)-K0251+492-K0251+554, K0251+764-K0252+44421PD0024 · ₱9,800,000.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF LAYBYS-ON SPECIFIC LOCATIONS ALONG QUIRINO H-WAY (BAGUIO-BAUANG) (S00420LZ) KO299+570 TO KO303+79019PD0021 · ₱8,840,300.86 · mapped
- BASIC INFRASTRUCTURE PROGRAM - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY FAIRVIEW, BAGUIO CITY24PD0064 · ₱4,950,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF COVERED COURT, PUROK 3, GIBRALTAR, BAGUIO CITY, BENGUET19PD0091 · ₱3,718,038.41 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4(HDM-4), SECONDARY ROADS, DANTAY-SAGADA RD-K0395+227617PI0011 · ₱2,149,424.25 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONCRETING OF ROAD CONCRETING OF PUROK-AYALA, BARANGAY STO. NINO-SLAUGHTER, BAGUIO CITY, BENGUET19PD0084 · ₱1,980,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY LOPEZ JAENA, BAGUIO CITY24PD0063 · ₱1,980,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF CONNECTION OF SEWERLINE FROM PUROK 1 TO RIMANDO ROAD, WEST MODERNSITE, BAGUIO CITY, BENGUET17PD0027 · ₱1,631,632.95
- PREVENTIVE MAINTENANCE OF ROAD : CONCRETE REBLOCKING 280MM - SPECIFIC LOCATION ALONG PICO - LAMTANG ROAD (S00401LZ), K0258+563 - K0260+277, LA TRINIDAD, BENGUET20PE0004 · ₱1,600,069.60 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →