WYNE ROSE CONST AND SUPPLY CORP is listed as a company organization in Philippine public procurement records on this site, with 26 linked DPWH project(s) totaling about ₱564,625,982.49. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
WYNE ROSE CONST AND SUPPLY CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 26
- Total value
- ₱564,625,982.49
- Published flags
- 0
- Region
- Cebu 2nd DEO · Region VII
Licensed officers (PCAB)
- Aurora Patenio Obial · Authorized Managing Officer (PCAB license 53832) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for WYNE ROSE CONST AND SUPPLY CORP — not an accusation or finding of wrongdoing.
Score: 78.20 / 100 · Projects in sample: 26 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 66.7
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 16
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 20
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 6
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 26
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 26
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 26
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 26
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
26 geotagged projects — Open full map · Download projects (CSV)
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES LLORENTE BR. (B00482SM), ALONG BORONGAN-GUIUAN RD24IB0010 · ₱88,779,885.00 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES (INSTALLATION OF CARON FIBER) SURIBAO BR. (B00479SM) ALONG BORONGAN - GUIUAN ROAD23IB0050 · ₱72,374,993.00 · mapped
- OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENACE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY LALAO, SAN JUAN, SIQUIJOR24HM0045 · ₱49,000,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0077+500 - K0078+57224HG0061 · ₱29,865,000.00 · mapped
- Construction of Lusapon Flood Control, Boljoon, Cebu23HG0047 · ₱29,399,938.40 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, OFF-CARRIAGEWAY IMPROVEMENT) ALONG LEMON-LEYTE-BILIRAN RD K0977+000 K0979+29225IE0029 · ₱29,389,316.99 · mapped
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION (COMPLETION) OF PROFESSIONAL REGULATION COMMISSION, SUDLON, BARANGAY LAHUG, CEBU CITY24HH0067 · ₱29,375,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS -CEBU BALAMBAN TRANSCENTRAL HIGHWAY- K0024+052 - K0024+162, CEBU CITY23HH0075 · ₱29,087,000.00 · mapped
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION (COMPLETION) OF PROFESSIONAL REGULATION COMMISSION, SUDLON, BARANGAY LAHUG, CEBU CITY23HH0109 · ₱23,460,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG N BACALSO AVE (CEBU SOUTH RD) - K0075 + 000 - K0076 + 00025HE0037 · ₱21,034,348.00 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, OFF-CARRIAGEWAY IMPROVEMENT) ALONG SAMBULAWAN JCT-CALAGUISE-CALUBIAN RD K0984+(-301) K0986+19525IE0030 · ₱19,589,594.81 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LUSAPON FLOOD CONTROL, BOLJOON, CEBU24HG0118 · ₱19,574,727.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - LAGNASON BR. ALONG N. BACALSO AVE. (CEBU SOUTH RD)24HG0065 · ₱19,354,480.00 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0100 + 000 - K0100 + 92325HE0088 · ₱18,872,420.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SITIO MALALAG, BAR25HE0001 · ₱14,670,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND, MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF GUARDRAILS (SAFETY ROLLER BARRIER SYSTEM) ALONG DALAGUETE-MANTALONGON-BADIAN RD, K0089+530 - K0092+60024HG0058 · ₱13,204,900.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - SUMAGUAN BR. ALONG ARGAO-MOALBOAL RD24HG0066 · ₱13,106,997.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LAMACAN, ARGAO, CEBU25HE0021 · ₱7,908,000.00 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG TABING-KAWAYAN-STA ROSA-LAWIS-TABANGO RD K1025+(-356) K1025+(-097), K1025+(-799) K1025+(-356)25IE0031 · ₱6,449,385.29 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF BARANGAY EL PARDO-BARANGAY NANGKA ROAD, BOLJOON, CEB24HG0069 · ₱4,940,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BULAK, DALAGUETE, CEBU24HG0059 · ₱4,940,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, DALAGUETE, CEBU24HG0068 · ₱4,940,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY KAMAGAYAN, CEBU CITY24HH0091 · ₱4,930,000.00 · mapped
- SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, BARANGAY TAWASON, MANDAUE CITY25HN0006 · ₱4,889,997.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM - CONSTRUCTION OF RAINWATER COLLECTORS (RWCS) IN PUBLIC FACILITIES, CEBU CITY24HH0125 · ₱2,889,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM - CONSTRUCTION OF RAINWATER COLLECTORS (RWCS) IN PUBLIC FACILITIES, CEBU CITY25HH0155 · ₱2,601,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 53832
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Nov 10, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 53832); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 1 GPPB CPES release; average final rating 90.6% over 2 rated projects; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 22, 2025 | DPWH (JV) | ₱49,000,000.00 | Completed | 82.8% | 88.1% | 39th (rev), p. 231 |
| Mar 19, 2025 | DPWH | ₱29,865,000.00 | Completed | 92.6% | 93.1% | 39th (rev), p. 231 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 29 awards · ₱685,486,741.50
- DPWH Goods & services: 69 awards · ₱235,555,501.49
- City of Cebu Goods & services: 1 award · ₱19,996,667.05
- Purchase/delivery of 208 pcs. (additional) H Pile 12” x 12” x 12m (L) x 11mm (thick) for use in the immediate shoring of San Juanico Bridge
- Purchase/delivery and installation of solar street
- Purchase/delivery and installation of road safety
- Purchase/delivery of 208 pcs. (additional) H Pile 12” x 12” x 12m (L) x 11mm (thick)
- 25GHG0014
- 25GHE008
- 25GHF0007
- 25GHF0006
- 25GHI0024
- 2025-06-0051 Supply and delivery of Asphalt
- 2025-06-0052
- 2025-06-0055 Supply and delivery of Construction M
- 25GHN0001
- 25GHI0022
- 25GHG0013
- 25HE0021₱7,908,000.00· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 25GSHD0066
- 2025-03-0015 Supply and installation of signages a
- 2025-03-0021 Supply and delivery of themoplastic a
- 2025-03-0023 Supply and delivery of Asphalt Cement
- 2025-03-0017
- 25HE0088₱18,872,420.00· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 25HH0155₱2,601,000.00· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU CITY DEO
- Construction Materials and Supplies.
- 25HE0037₱21,034,348.00· 2025-03-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →