A R L CONST is listed as a company organization in Philippine public procurement records on this site, with 74 linked DPWH project(s) totaling about ₱4,379,513,081.13. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
A R L CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 74
- Total value
- ₱4,379,513,081.13
- Published flags
- 22
- Region
- Bulacan 1st DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for A R L CONST — not an accusation or finding of wrongdoing.
Score: 80.00 / 100 · Projects in sample: 74 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 62.8/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 62.8
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 54
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 70
- pastTargetOngoingProjects
- 16
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 74
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 74
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 91.5/100 · Weight: 11%
- projects
- 74
- componentScore
- 91.5
- flagsPerProject
- 0.28
- publishedV2Flags
- 21
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 74
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
49 geotagged project(s) — Open full map
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, MALOLOS SECTION, BARANGAY DAKILA, MALOLOS, BULACAN24CC0625 · ₱138,987,645.88 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, BULIHAN LONGOS SECTION, MALOLOS, BULACAN24CC0624 · ₱138,957,268.65 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BOCAUE RIVER AND ITS TRIBUTARIES, BUNLO-LOLOMBOY SECTION, BOCAUE, BULACAN20CC0199 · ₱99,000,000.00 · mapped
- Construction of River Control Project along Balagtas River, San Juan, Sta. 09+600 - Sta. 09+805, Balagtas, Bulacan23CC0090 · ₱96,499,923.27 · mapped
- Construction of Riverbank Protection Structure along Balagtas River, Barangay Pulong Gubat, Balagtas, Bulacan24CC0004 · ₱96,499,907.13 · mapped
- Construction of Spur Dike along Angat River, Talampas and Sta. Barbara Section, Sta. 00 + 672 - Sta. 01 + 00722CC0272 · ₱96,499,742.98 · mapped
- CONSTRUCTION OF RIVER CONTROL PROJECT ALONG GUIGUINTO RIVER, BAGBAG CREEK, BARANGAY MALIS, STA. 03+000 - STA. 03+360, GUIGUINTO, BULACAN23CC0127 · ₱96,499,727.90 · mapped
- Construction of River Control Project along Balagtas River, Panginay (Tributary), Sta. 15+060 - Sta. 15+265, Balagtas, Bulacan23CC0088 · ₱96,499,702.00 · mapped
- Construction of River Control Project along Guiguinto River, Barangay Malis, Sta. 02+250 - Sta. 02+610, Guiguinto, Bulacan23CC0099 · ₱96,499,623.93 · mapped
- Construction of River Control Project along Balagtas River, Panginay, Sta. 16+310 - Sta. 16+515, Balagtas, Bulacan23CC0091 · ₱96,499,347.85 · mapped
- Construction of Riverbank Protection Structure at Barangay Malis, Guiguinto, Bulacan24CC0039 · ₱96,499,176.96 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD. - MALOLOS SECTION, MALOLOS, BULACAN22CC0325 · ₱96,499,156.60 · mapped
- Construction of Riverbank Protection Structure along Balagtas River (Phase II), Barangay Pulong Gubat, Balagtas, Bulacan24CC0002 · ₱96,499,114.57 · mapped
- Construction of River Control Project along Guiguinto River, Barangay Daungan, Sta. 02+690 to Sta. 03+050, Guiguinto, Bulacan23CC0096 · ₱96,498,376.03 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS- DAANG MAHARLIKA ROAD (LZ) - PULILAN SECTION, PULILAN, BULACAN22CC0274 · ₱96,497,803.51 · mapped
- Construction of River Control Project along Guiguinto River, Tabang Tributary Section, Sta. 01+000 to Sta. 01+360, Guiguinto, Bulacan23CC0149 · ₱96,497,527.00 · mapped
- Construction of River Control Project along Balagtas River, Santol, Sta. 01+500 - Sta. 01+850, Balagtas, Bulacan23CC0089 · ₱96,496,501.75 · mapped
- Construction of Major River System, Angat River, Culianin and Makinabang Section, Sta. 00 + 632 to Sta. 01 + 007, Plaridel/Baliwag, Bulacan22CC0236 · ₱95,534,903.44 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE RIVER PROTECTION ALONG BALAGTAS RIVER, BARANGAY SAN JUAN, PUROK 1, BALAGTAS, BULACAN (PACKAGE D)25CC0490 · ₱95,008,158.32 · mapped
- CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN24CC0579 · ₱92,659,091.33 · mapped
- CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE F, BARANGAY TANAWAN, BUSTOS, BULACAN24CC0578 · ₱92,649,592.71 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD - K0043+000-K0045+809, MALOLOS, BULACAN24CC0616 · ₱92,639,822.65 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS - BIGAA-PLARIDEL VIA BULACAN AND MALOLOS RD - K0033+026-K0034+000, K0034+106-K0035+200, K0036+107-K0037+736.7, BULAKAN, BULACAN24CC0626 · ₱92,639,496.99 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT MALIS (PAHSE II) GUIGUINTO, BUALACAN24CC0038 · ₱92,620,438.82 · mapped
- Construction of Slope Protection along Angat River, Culianin Section, Sta. 00 + 000 - Sta. 00 + 63222CC0235 · ₱78,743,785.69 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY LOLOMBOY, BOCAUE, BULACAN25CC0198 · ₱78,742,762.35 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER (PHASE I), BARANGAY BAMBANG (PUROK 6), BOCAUE, BULACAN24CC0160 · ₱78,163,888.94 · mapped
- Construction of Reinforced Concrete Flood Control Structure along Bocaue River, Barangay Turo, Bocaue, Bulacan24CC0161 · ₱78,161,014.06 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY SIPAT, PLARIDEL, BULACAN24CC0397 · ₱77,199,875.97 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FL;OOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY POBLACION (PUROK 1), BUSTOS, BULACAN24CC0368 · ₱77,199,521.84 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY PARULAN (PUROK 2), PLARIDEL, BULACAN24CC0382 · ₱77,199,340.12 · mapped
- Construction of Reinforced Concrete Flood Control Structure along Angat River, Barangay San Pedro (Purok 2), Bustos, Bulacan24CC0369 · ₱77,198,882.23 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER, BARANGAY TURO (PUROK 1), BOCAUE, BULACAN25CC0182 · ₱74,117,588.24 · mapped
- CONSTRUCTION OF FLOOD MITIGATION FACILITY AT BUNLO-LOLOMBOY TRIBUTARIES, BOCAUE, BULACAN25CC0324 · ₱74,111,932.61 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY TANGOS (PUROK 3), BALIUAG, BULACAN25CC0066 · ₱74,111,845.05 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA (PUROK 1), BALIUAG, BULACAN25CC0062 · ₱74,111,731.21 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MANILA NORTH ROAD (LZ) K0037+(-993) - K0038+306, K0039+151 - K0041+048, K0041+400 - K0041+840, K0042+900 - K0043+118, MALOLOS, BULACAN20CC0090 · ₱72,384,138.71 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WAR=TERWAYS ALONG GUIGUINTO RIVER BRGY, DAUNGAN GUIGUINTO, BULACAN STA. 004+690 TO STA. 004+89023CC0551 · ₱72,374,603.42 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY. STA. CRUZ GUIGUINTO, BULACAN STA. 005+430 TO STA. 005+63023CC0552 · ₱72,374,576.48 · mapped
- CONSTRUCTION OF BALAGTAS RIVER FLOOD MITIGATION STRUCTURE (STA. 07+654 TO STA. 07+804) AT BRGY. DALIG, BALAGTAS, BULACAN23CC0489 · ₱72,374,375.81 · mapped
- CONSTRUCTION OF BALAGTAS RIVER FLOOD MITIGATION STRUCTURE (STA. 14+124 TO STA. 14+274) AT BRGY. SAN JUAN, BALAGTAS, BULACAN23CC0490 · ₱69,480,238.81 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN25CC0108 · ₱69,479,332.85 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN25CC0130 · ₱69,479,280.26 · mapped
- Construction of Flood Control Structure along Bagbag Creek, Barangay Sta. Cruz, Guiguinto, Bulacan (K003+772 to K003+922)23CC0212 · ₱48,999,246.30 · mapped
- IMPROVEMENT OF M. ROXAS JR. FLYOVER (STA. 1+940.00 - STA. 2+693.00) AND R-10 ROAD (STA. 2+693.00 - -STA. 4+576.00)(NB/SB) CITY OF MANILA17O00026 · ₱47,793,547.17
- Construction of Slope Protection Structures at Guiguinto River (Bagbag Creek, Sta. 0 + 000 - Sta. 0 + 780), Barangay Malis, Guiguinto, Bulacan22CC0096 · ₱45,079,451.15 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER RUEDA SECTION STA. 00+000 - STA. 00+353.60, PLARIDEL, BULACAN20CC0039 · ₱42,894,749.70 · mapped
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION ALONG BULAKAN RIVER, DAAN ESRACION, SAN JOSE, BULAKAN, BULACAN21CC0225 · ₱39,199,679.52 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROAD - BIGAA-PLARIDEL VIA BULACAN & MALOLOS ROAD K0033+026 - K0033+624, K0033+1005 - K0034+009, K0034+710 - K0035+201, K0040+520 - K0041+263, K0047+914 - K0048+000, K0048+480 - K0048+517, K0048+518CC0336 · ₱39,084,470.90 · mapped
- REHAB./RECONST. OF BONIFACIO DRIVE SO2723LZ (SB)=K0001+(-605) - K0001+(-660); SO2782LZ (NB)=CH 433-CH488 AND ASPHALT OVERLAY OF M. ROXAS JR. BRIDGE SO2272LZ (SB)=K0002+(-316) - K0002+224;SO2781LZ (NB) =K0002+017 MANILA CITY16O00045 · ₱38,251,071.68 · mapped
