CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER (PHASE I), BARANGAY BAMBANG (PUROK 6), BOCAUE, BULACAN
CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER (PHASE I), BARANGAY BAMBANG (PUROK 6), BOCAUE, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱78,163,888.94. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: A R L CONST. Figures trace to dpwh.
Total Contract Cost




