V B MANUBAY CONST is listed as a company organization in Philippine public procurement records on this site, with 163 linked DPWH project(s) totaling about ₱4,851,325,623.59. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
V B MANUBAY CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 163
- Total value
- ₱4,851,325,623.59
- Published flags
- 33
- Region
- Isabela 4th DEO · Region II
Licensed officers (PCAB)
- Veronica Bolisay Manubay · Authorized Managing Officer (PCAB license 32705) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for V B MANUBAY CONST — not an accusation or finding of wrongdoing.
Score: 85.70 / 100 · Projects in sample: 163 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 74.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 74.1
- lateCompletedProjects
- 10
- onTimeCompletedProjects
- 124
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 154
- pastTargetOngoingProjects
- 20
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 98.2/100 · Weight: 21%
- totalProjects
- 163
- componentScore
- 98.2
- terminatedProjects
- 1
- terminationRatePct
- 0.6
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 163
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 93.9/100 · Weight: 11%
- projects
- 163
- componentScore
- 93.9
- flagsPerProject
- 0.2
- publishedV2Flags
- 33
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 163
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 161 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Construction of Santos Flood Control Structures, Santos, San Agustin, Isabela24BH0086 · ₱115,800,000.00 · mapped
- Construction of Tuao North-Tuao South Flood Control Structure along Magat River, Sitio Dumayop, Tuao North-Tuao South, Bagabag, Nueva Vizcaya24BI0063 · ₱96,500,000.00 · mapped
- Construction of Papan Weste Flood Control Structure, Section 4, Jones, Isabela24BH0209 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure, Barangay Digumased, Section 1, Dinapigue, Isabela23BH0203 · ₱96,500,000.00 · mapped
- Construction of Nalubbunan Flood Control Structure, Angadanan River, Nalubbunan, Quezon, Nueva Vizcaya24BI0062 · ₱96,500,000.00 · mapped
- Construction of Barangay Salay Flood Control Structure, Section 2, San Agustin, Isabela23BH0153 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure along Magat River, Barangay Magsaysay, Bayombong, Nueva Vizcaya24BI0025 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure along Santa Fe River, Barangay Aliaga, Bambang, Nueva Vizcaya24BI0020 · ₱96,500,000.00 · mapped
- Construction of Barangay Minuri Flood Control Structure, Section 3, Jones, Isabela23BH0102 · ₱96,500,000.00 · mapped
- Construction of Barangay Dibuluan Flood Control Structure, Section 3, Jones, Isabela23BH0156 · ₱96,500,000.00 · mapped
- Construction of Sta. Lucia Flood Control Structure along Lamut River, Barangay Sta. Lucia, Bagabag, Nueva Vizcaya24BI0061 · ₱96,500,000.00 · mapped
- Construction of Barangay Papan Weste Flood Control Structure, Section 1, Jones, Isabela23BH0103 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. PALAGAO FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA23BH0266 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. PAPAN WESTE FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA23BH0267 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. MINURI FLOOD CONTROL STRUCTURE, SECTION 4, JONES, ISABELA23BH0261 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF PALACIAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUSTIN, ISABELA24BH0219 · ₱96,500,000.00 · mapped
- Construction of Barangay Sto. Domingo Flood Control Structure, Section 1, Jones, Isabela23BH0105 · ₱96,499,800.46 · mapped
- Construction of Barangay Sto. Domingo Flood Control Structure, Section 2, Jones, Isabela23BH0128 · ₱96,499,762.04 · mapped
- Construction of Barangay Salay Flood Control Structure, Section 1, San Agustin, Isabela23BH0152 · ₱96,499,591.31 · mapped
- Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 2, San Agustin, Isabela23BH0137 · ₱96,490,419.85 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF LAOAG FLOOD CONTROL STRUCTURE SECTION 1, SAN AGUSTIN, ISABELA24BH0206 · ₱96,485,001.88 · mapped
- Construction of Addalam Flood Control Structure, Purok 4, barangay Addalam, Jones, Isabela24BH0222 · ₱96,452,294.94 · mapped
- Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 1, San Agustin, Isabela23BH0136 · ₱96,424,760.83 · mapped
- Construction of Laoag Flood Control Structures, Sta. 0+000-Sta. 0+790, San Agustin, Isabela24BH0197 · ₱96,398,940.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MAPALAD FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUSTIN, ISABELA24BH0280 · ₱96,203,238.10 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- SANTIAGO CIRCUMFERENTIAL ROAD, PACKAGE 2, ISABELA23B00001 · ₱96,196,553.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF DIVISORIA FLOOD CONTROL STRUCTURES, SANTIAGO CITY, ISABELA (SECTION 2)25BH0292 · ₱96,032,844.77 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCD25BI0033 · ₱95,535,493.76 · mapped
- CONST'N/IMPV'T OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: ACCESS ROAD LEADING TO DARIUK HILLS, BRGY. BALINTOCATOC, SANTIAGO CITY, ISABELA18B00026 · ₱93,120,349.49 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BYPASS AND DIVERSION ROADS: SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA; STA. 000+000-STA. 002+584.7720B00030 · ₱92,432,161.39 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. VIRGONEZA FLOOD CONTROL STRUCTURE, SECTION 3, SAN AGUSTIN, ISABELA23BH0263 · ₱78,776,941.61 · mapped
- Construction of Villaflor Flood Control Structure, Sta. 0+000 - Sta. 0+595, San Isidro, Isabela22BH0115 · ₱76,703,990.00 · mapped
- Construction of Flood Control along Ganano River, Sta.1 + 787 - Sta.2 + 250, Batal, Santiago City, Isabela22BH0108 · ₱72,374,738.52 · mapped
- Construction of Flood Control along Ganano River at Batal (Sta. 0+800 - Sta. 1+300), Isabela22BH0059 · ₱71,185,884.17 · mapped
- Construction of Flood Control along Ganano River at Batal (Sta. 1+300 - Sta. 1+787), Isabela22BH0060 · ₱69,479,741.60 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BRGY. SALAY FLOOD CONTROL STRUCTURE SECTION 3, BRGY. SAL23BH0252 · ₱67,550,000.00 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVE NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HDM-417BH0010 · ₱63,036,695.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SANTIAGO CITY BY-PASS ROAD, PACKAGE 2, ISABELA24BH0028 · ₱56,124,400.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT25BI0039 · ₱52,144,212.66 · mapped
- Rehabilitation of Flood Control Structure along Magat River, (Phase 1) Barangay Busilac, Bayombong, Nueva Vizcaya24BI0038 · ₱49,000,000.00 · mapped
- Rehabilitation of Flood Control Structure along Santa Cruz River, Barangay Salinas, Bambang, Nueva Vizcaya24BI0019 · ₱49,000,000.00 · mapped
- Construction of Sta. Cruz Flood Control Project at Barangay Sta. Cruz, Echague, Isabela22BH0112 · ₱49,000,000.00 · mapped
- Construction of Flood Control Structure, Brgy. Sinsayon, Santiago City, Isabela22BH0146 · ₱49,000,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE SINAOANGAN SUR, STA. 0+000 - STA. 0+38521BH0049 · ₱49,000,000.00 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - JCT. IPIL-QUIRINO BDRY. ROAD - K0364+920 - K0366+25120BH0002 · ₱49,000,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL STRUCTURE SECTION 1, SAN AGUSTIN, ISABELA25BH0303 · ₱47,528,658.49 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - SANTIAGO - TUGUEGARAO RD - K0330+215 - K0331+31023BH0228 · ₱47,137,981.55 · mapped
- CONSTRUCTION OF DAMMANG WEST FLOOD CONTROL STRUCTURE16BH0097 · ₱45,449,772.97 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE, DABUBU GRANDE, STA. 0+330 - STA. 0+75521BH0064 · ₱45,013,463.03 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - JCT. IPIL - QUIRINO BDRY. ROAD - K0353+300 - K0354+78021BH0105 · ₱44,306,780.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 32705
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jul 12, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 32705); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
12 evaluations listed across 6 GPPB CPES releases; average final rating 1553.2% over 6 rated projects; 12 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 12, 2025 | DPWH | ₱96,485,002.00 | On-going | 92.0% | — | 39th (rev), p. 219 |
| Oct 21, 2024 | DPWH | ₱96,500,000.00 | On-going | 90.5% | — | 39th (rev), p. 219 |
| Oct 17, 2024 | DPWH | ₱96,398,940.00 | On-going | 89.6% | — | 39th (rev), p. 219 |
| Aug 13, 2024 | DPWH | ₱55,565,322.00 | On-going | 95.6% | — | 38th, p. 250 |
| Mar 21, 2024 | DPWH | ₱96,500,000.00 | Completed | 95.4% | 95.4% | 37th, p. 112 |
| Mar 21, 2024 | DPWH | ₱27,857,431.00 | Completed | 94.2% | 94.2% | 37th, p. 112 |
| Nov 23, 2023 | DPWH | ₱9,798,645.00 | Completed | 93.4% | 93.4% | 37th, p. 113 |
| Jan 25, 2023 | DPWH | ₱76,703,990.00 | Completed | 92.1% | 92.1% | 35th, p. 179 |
| Oct 14, 2022 | DPWH | ₱71,185,884.00 | Completed | 92.3% | 8858.0% | 35th, p. 179 |
| Jul 2, 2022 | DPWH | ₱71,185,884.00 | On-going | 86.1% | — | 34th, p. 88 |
| Mar 8, 2020 | DPWH | ₱9,900,000.00 | Completed | 93.2% | 86.3% | 40th, p. 314 |
| Nov 7, 2019 | DPWH | ₱9,900,000.00 | On-going | 83.4% | — | 40th, p. 314 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →