BRG CONST is listed as a company organization in Philippine public procurement records on this site, with 85 linked DPWH project(s) totaling about ₱2,466,871,136.01. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
BRG CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 85
- Total value
- ₱2,466,871,136.01
- Published flags
- 1
- Region
- Nueva Vizcaya DEO · Region II
Online presence
Google Maps: BRG Construction★ 5 (1 reviews)Google Maps, 2026-10-22
Purok 1 Magsaysay, Bayombong, Nueva Vizcaya
Licensed officers (PCAB)
- BAYANI ROQUE GAJES · Authorized Managing Officer (PCAB license 21931) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for BRG CONST — not an accusation or finding of wrongdoing.
Score: 89.20 / 100 · Projects in sample: 85 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 83.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 83.7
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 72
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 83
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 96.5/100 · Weight: 21%
- totalProjects
- 85
- componentScore
- 96.5
- terminatedProjects
- 1
- terminationRatePct
- 1.2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 84
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.6/100 · Weight: 11%
- projects
- 85
- componentScore
- 99.6
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 85
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 84 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Construction of Flood Control along Sta. Fe River, Balete Section, Sta. Fe, Nueva Vizcaya24BJ0005 · ₱96,499,928.41 · mapped
- Construction of Flood Control along Benay River, Palabotan Section, Dupax del Sur, Nueva Vizcaya24BJ0006 · ₱96,492,915.54 · mapped
- Construction of Flood Control along Benay River, Bagumbayan Section, Dupax del Sur, Nueva Vizcaya23BJ0031 · ₱96,490,357.25 · mapped
- Construction of Flood Control along Manga River, Bitnong Section, Dupax del Norte, Nueva Vizcaya23BJ0030 · ₱96,472,643.42 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. CRUZ RIVER, SITIO PALTUG, BARANGAY SAN F25BJ0012 · ₱93,662,634.62 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. CRUZ RIVER, BARANGAY GABUT, DUPAX DEL S25BJ0023 · ₱93,537,141.41 · mapped
- Construction of Flood Control along Santa Cruz River, San Fabian Section, Kayapa, Nueva Vizcaya22BJ0042 · ₱91,506,760.15 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD STRUCTURE ALONG TUBO RIVER, BARANGAY PUDI, KASIBU, NUEVA VIZCAYA25BJ0026 · ₱88,943,084.95 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DUPAX DEL SUR BYPASS, NUEVA VIZCAYA, DUPAX DEL SUR, NUEVA VIZCAYA23BJ0037 · ₱87,814,328.83 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION CONSTRUCTION UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS PRIMARY ROADS POBLACION, BAMBANG, NUEVA VIZCAYA SECTION 1 : STA. 0 + 000 STA. 0 + 533.85, SECTION 2: S23BI0051 · ₱77,199,882.91 · mapped
- Construction of Sto. Domingo Flood Control Structure along Magat River, Bambang, Nueva Vizcaya23BI0044 · ₱49,000,000.00 · mapped
- Construction of Sta. Fe River Control Structure, Almaguer South Section, Bambang, Nueva Vizcaya22BI0056 · ₱49,000,000.00 · mapped
- Construction of San Fernando - Macate - Abinganan Flood Control along San Fernando River, Bambang, Nueva Vizcaya23BI0004 · ₱49,000,000.00 · mapped
- Construction of Homestead Flood Control Structure along Sta. Fe River, Bambang, Nueva Vizcaya22BI0036 · ₱49,000,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, NAGCUARTELAN SECTION, ARITAO, NUEVA VIZCAYA21BJ0013 · ₱48,999,924.92 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MARANG RIVER FLOOD CONTROL STRUCTURES, BITNONG SECTION, DUPAX DEL NORTE, NUEVA VIZCAYA21BJ0009 · ₱48,999,644.14 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOODS MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF SAN FERNANDO FLOOD CONTROL AT BRGY. SAN FER23BI0123 · ₱48,250,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE BRIDGE25BJ0065 · ₱47,724,098.14 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, BONE NORTH SECTION, ARITAO, NUEVA VIZCAYA21BJ0014 · ₱47,037,905.42 · mapped
- ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF MAGAT RIVER, STO DOMINGO, STA. 0+000-STA.0+644, BAMBANG, NUEV20BI0028 · ₱47,009,620.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD STRUCTURE ALONG SANTA CRUZ RIVER, BARANGAY PINGKIAN, KAYAPA, NUEVA VI25BJ0009 · ₱46,808,447.95 · mapped
- FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, POBLACION SECTION ARITAO, NUEVA VIZCAYA20BJ0022 · ₱46,058,258.27 · mapped
- Construction of Magat River Control, Magapuy Section (Sta. 0+000 - Sta. 0+484), Bayombong, Nueva Vizcaya22BI0017 · ₱44,100,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS PAPAYA-MALABING-WANGAL- BINU24BI0064 · ₱44,100,000.00 · mapped
- CSSP, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES ANDECONOMIC ZONES-POBLACION-BACLAS ROAD CONNECTING BRGY. BACLAS AND PROVINCIAL ROAD IN SUPPORT OF COFFEE INDUSTRY, AMBAGUIO, NUEVA VIZCAYA21BI0040 · ₱42,022,400.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, DM JCT. MALASIN ROAD, K0252+650-K0253+848 DUPAX DEL NORTE, NUEVA VIZCAYA22BJ0036 · ₱38,431,795.41 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES COMPLETION OF MULTI-PURPOSE BUILDING NUEVA VIZCAYA STATE UNIVERSITY (NVSU), BAMBANG, NUEVA VIZCAYA25BI0097 · ₱38,345,314.64 · mapped
- Construction of Surong Centro CIS Flood Protection Works Along Tubo River, Kasibu, Nueva Vizcaya24BJ0004 · ₱37,553,841.26 · mapped
- ORGANIZATIONAL OUTCOME 1: : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM- BRIDGE PROGRAM REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES ROSARIO BR. 2 (B01260LZ) ALONG BAMBANG-KASIBU-SOLANO RD.23BI0025 · ₱36,260,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - SECONDARY ROADS NUEVA VIZCAYA-BENGUET ROAD - K0236+(-590) - K0236+225, K0236+256 - K0236+357, K0236+880-K0236+895, ARITAO, NUEVA VIZCAYA23BJ0038 · ₱35,587,500.00 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE-REHABILITATION-MAJOR REPAIROF PERMANENT BRIDGES-SN. LORENZO RUIZ BR. (B01235LZ) ALONG DAANG MAHARLIKA (LZ )BAGABAG, NUEVA VIZCAYA19BI0038 · ₱32,830,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE FACILITY, (NUEVA VIZCAYA STATE UNIVERSITY SPORTS COMPLEX), BAYOMBONG, NUEVA VIZCAYA24BI0102 · ₱29,700,000.00 · mapped
- Construction of Drainage Canal, Bambang, Nueva Vizcaya23BI0078 · ₱29,400,000.00 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, MANGAYANG SECTION, MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA19BJ0001 · ₱26,620,132.97 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF MANGA RIVER FLOOD CONTROL STRUCTURES, BITNONG SECTION, BITNONG, DUPAX DEL NORTE, NUEVA VIZCAYA19BJ0002 · ₱26,459,899.41 · mapped
- LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE FLOOD STRUCTURE-CONSTRUCTION OF STA. FE CONTROL, BRGY. INDIANA SECTION, PHASE 3, BAMBANG, NUEVA VIZCAYA19BI0050 · ₱24,750,000.00 · mapped
- LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD BASA ST. EXTENSION-GOMEZ ST. EXTENSION-PINDONG ST. EXTENSIONBARANGAY SALVACION, BAYOMBONG, NUEVA VIZCAY21BI0071 · ₱24,750,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSETS PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-DAANG MAHARLIKA (LZ), K0286+150-K0286+200, K0295+050-K0295+2018BI0049 · ₱23,432,614.47 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMCSSPCONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT-POBLACION- BACLAS R22BI0008 · ₱22,034,320.00 · mapped
- ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ) K0246+900-K0247+541 BAMBANG, NUEVA VIZCAYA20BI0024 · ₱20,168,400.00 · mapped
- LOCAL PROGRAM,LOCAL INFRASTRUCTURE PROGRAM,FLOOD CONTROL AND DRAINAGE, FLOOD CONTROLSTRUCTURE,CONSTRUCTION OF STA. CRUZ RIVER CONTROL, BRGY. MAUAN19BI0067 · ₱19,800,000.00 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA-K0272+381-K0273+006, SOLANO, NUEVA VIZCAYA19BI0026 · ₱19,600,000.00 · mapped
- CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RD. REPLACEMENT OF PERMANENT WEAK BRIDGES,BATUNGBAET B15BI0116 · ₱17,640,000.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES BONFAL BR. (B01232LZ) ALONG DAANG MAHARLIKA (LZ) BAYOMBONG, NUEVA VIZCAYA17BI0039 · ₱17,458,550.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADSLEADING TO DECLARED TOURISM DESTINATION-ACCESS ROAD LEADING TO LOWER MAGAT ECOTOURISM PARK., DIADI, NUEVA VIZCAYA18BI0085 · ₱15,764,985.36 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM-BIP ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BRIDGE, BRGY. MAUAN, BAMBANG, NUEVA VIZCAYA23BI0030 · ₱14,850,000.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES ORIWONG BR. (BO1240LZ) ALONG DAANG MAHARLIKA (LZ), DIADI, NUEVA VIZCAYA17BI0021 · ₱14,827,607.16 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE ALONG PRIMARY ROADS DAANG MAHARLIKA (LZ)- K0239+291-K0240+057 ARITAO, NUEVA VIZCAYA22BJ0027 · ₱14,539,221.59 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES BUAYA BR. (B01244LZ) ALONG DAANG MAHARLIKA, DIADI, NUEVA VIZCAYA17BI0038 · ₱14,295,635.20 · mapped
- ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE-SAN LEONARDO SECTION ALONG MATUNO RIVER,18BI0010 · ₱14,104,865.57 · mapped
Equipment & capacity
PCAB license
- License no.
- 21931
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Oct 10, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 21931); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
15 evaluations listed across 6 GPPB CPES releases; average final rating 93.1% over 7 rated projects; 15 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 3, 2025 | DPWH | ₱96,499,928.00 | Completed | 93.4% | 92.4% | 40th, p. 44 |
| Feb 18, 2025 | DPWH | ₱37,553,841.00 | Completed | 94.4% | 87.5% | 39th (rev), p. 30 |
| Feb 17, 2025 | DPWH | ₱44,100,000.00 | Completed | 95.9% | 94.4% | 39th (rev), p. 29 |
| Oct 23, 2024 | DPWH | ₱96,499,928.00 | On-going | 91.8% | — | 39th (rev), p. 30 |
| Aug 20, 2024 | DPWH | ₱96,492,916.00 | On-going | 97.0% | — | 38th, p. 42 |
| Aug 19, 2024 | DPWH | ₱44,100,000.00 | On-going | 93.4% | — | 38th, p. 32 |
| May 22, 2024 | DPWH | ₱36,815,974.00 | On-going | 82.9% | — | 38th, p. 32 |
| Nov 25, 2023 | DPWH | ₱87,814,329.00 | Completed | 97.1% | 97.1% | 37th, p. 13 |
| Mar 17, 2023 | DPWH | ₱38,431,795.00 | Completed | 93.5% | 94.0% | 35th, p. 23 |
| Mar 16, 2023 | DPWH | ₱49,000,000.00 | Completed | 94.1% | 90.9% | 35th, p. 23 |
| Oct 26, 2022 | DPWH | ₱51,988,305.00 | Completed | 94.7% | 95.5% | 35th, p. 29 |
| Jul 4, 2022 | DPWH | ₱35,045,046.00 | On-going | 95.8% | — | 34th, p. 13 |
Showing the 12 most recent of 15.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →