ND CARANZO BUILDERS AND CONST SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 85 linked DPWH project(s) totaling about ₱758,187,674.21. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
ND CARANZO BUILDERS AND CONST SUPPLY
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 85
- Total value
- ₱758,187,674.21
- Published flags
- 0
- Region
- Samar 1st DEO · Region VIII
Online presence
Google Maps: ND Caranzo BuildersGoogle Maps, 2026-10-22
Calbayog, Samar
Licensed officers (PCAB)
- Nilo Divina Caranzo · Authorized Managing Officer (PCAB license 39145) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ND CARANZO BUILDERS AND CONST SUPPLY — not an accusation or finding of wrongdoing.
Score: 86.60 / 100 · Projects in sample: 85 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 80
- lateCompletedProjects
- 8
- onTimeCompletedProjects
- 68
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 83
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 96.5/100 · Weight: 24%
- totalProjects
- 85
- componentScore
- 96.5
- terminatedProjects
- 1
- terminationRatePct
- 1.2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 84
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 85
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 85
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 42 of 65 geotagged projects (largest by contract value) — Open full map
- Construction of Flood Control Structure along Jibatang River, Barangay Basud, Calbayog City, Samar23IJ0010 · ₱52,938,612.00 · mapped
- CONSTRUCTION OF BRGY LUNGIB, VICTORIA, NORTHERN SAMAR - BRGY HAPPY VALLEY, SAN ISIDRO, NORTHERN SAMAR, CIRCUMFERENTIAL ROAD, VICTORIA & SAN ISIDRO, NORTHERN SAMAR25IH0059 · ₱49,004,019.83 · mapped
- CONSTRUCTION OF BY-PASS ROAD, LAVEZARES NORTHERN SAMAR25IH0056 · ₱48,509,642.04 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JIBATANG RIVER (UPSTREAM), BRGY. OQUENDO (PUROK 2), CALBAYOG CITY, SAMAR21IJ0059 · ₱39,012,500.78 · mapped
- (RE-ADVERTISE) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG AIRPORT BY-PASS ROAD, SAMAR22IJ0069 · ₱33,335,608.09 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0756+000 - K0756+78025I00037 · ₱33,284,118.22 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONST. OF BAGACAY - CONCORD ROAD, HINABANGAN, SAMAR, STA. 0+000 - STA. 0+60022IK0087 · ₱29,672,840.11 · mapped
- LOCAL PROGRAM: REHABILITATION OF ROAD, BRGY. PILAR, CALBAYOG CITY, SAMAR19IJ0196 · ₱24,493,008.94 · mapped
- (RE-ADVERTISE) CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-BUILDING AND OTHERSTRUCTURES.MULTI-PURPOSE/FACILITIES.CONSTRUCTION OF MULTI-PURPOSEBUILDING,BRGY.MABUHAY,STA.MARGARIT,SAMAR19IJ0098 · ₱19,576,921.65 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TABAWAN, CALBAYOG CITY, SAMAR19IJ0010 · ₱19,443,856.72 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER (UPSTREAM), BRGY. 14 DE AGOSTO, GANDARA, SAMAR19IJ0009 · ₱18,033,376.25 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BRGY. GERALI, GANDARA, SAMAR20IJ0075 · ₱17,860,000.00 · mapped
- LOCAL PROGRAM: CONSTRUCTION OF ROAD,BRGY. BAAY,CALBAYOG CITY,SAMAR19IJ0188 · ₱17,309,000.00 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG MALAGA RIVER, BRGY. MALAGA,CALBAYOG CITY,SAMAR20IJ0029 · ₱17,295,498.00 · mapped
- CONCRETING OF SAN JORGE EXPERIMENT STATION FMR, BRGY. ANQUIANA, SAN JORGE, SAMAR22IJ0094 · ₱15,820,649.82 · mapped
- CONSTRUCTION OF THREE (3) STOREY - SIX (6) CLASSROOM SCHOOL BUILDING, DAGUM ELEMENTARY SCHOOL, CALBAYOG CITY, SAMAR17IJ0168 · ₱14,433,632.00 · mapped
- CONSTRUCTION OF THREE (3) STOREY - SIX (6) CLASSROOM SCHOOL BUILDING, CALBAYOG SPED CENTER, CALBAYOG CITY, SAMAR17IJ0163 · ₱14,262,515.15 · mapped
- LOCAL PROGRAM: CONSTRUCTION OF SCHOOL BUILDING, NWSSU-SAN JORGE CAMPUS, SAN JORGE, SAMAR20IJ0077 · ₱12,855,640.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY - SIX (6) CLASSROOM SCHOOL BUILDING, GUIN-ON ELEMENTARY SCHOOL, CALBAYOG CITY, SAMAR17IJ0206 · ₱12,277,924.77 · mapped
- CONSTRUCTION OF TWO (2) STOREY - SIX (6) CLASSROOM SCHOOL BUILDING, MALAGA NATIONAL HIGH SCHOOL - PENA / ANNEX, CALBAYOG CITY, SAMAR17IJ0204 · ₱12,101,572.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING, MALAGA NATIONAL HIGH SCHOOL - PEÑA I ANNEX SCHOOL, CALBAYOG CITY, SAMAR18IJ0192 · ₱11,615,400.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0705+000 - K0705+055, K0705+872 - K0706+00025I00040 · ₱10,120,660.48 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING, MAJACOB INTEGRATED SCHOOL,TARANGNAN, SAMAR18IJ0200 · ₱10,116,074.78 · mapped
- CONSTRUCTION OF FOUR (4) UNITS, ONE (1) STOREY WORKSHOP BUILDING, BUENAVISTA SENIOR HIGH SCHOOL, SAN JORGE, SAMAR17IJ0141 · ₱9,926,168.62
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING, BAQUIW NATIONAL HIGH SCHOOL, TAGAPUL-AN, SAMAR18IJ0196 · ₱9,852,687.00 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING, COSTA RICA NATIONAL HIGH SCHOOL, ALMAGRO, SAMAR18IJ0193 · ₱9,831,800.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING CATARMAN I CENTRAL ELEMENTARY SCHOOL, CATARMAN, N. SAMAR18IH0044 · ₱9,749,687.18 · mapped
- CSSP: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DAGUM, CALBAYOG CITY,SAMAR22IJ0074 · ₱9,716,503.32 · mapped
- REHABILITATION OF SEED STORAGE SAN JORGE, SAN JORGE, SAMAR17IJ0226 · ₱9,211,810.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) - K0697+000 - K0697+202, K0698+667 - K0698+68725I00044 · ₱8,090,342.47 · mapped
- CONSTRUCTION/REHABILITATION OF ENRIQUETA-CHANSVILLA ROAD, BRGY. ENRIQUETA TO BARGY CHANSVILLA, LAVEZARES NORTHERN SAMAR25IH0060 · ₱6,790,925.71 · mapped
- REPAIR/REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. CAGNIPA, CALBAYOG CITY, SAMAR19IJ0222 · ₱6,135,198.51 · mapped
- BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES: RAWIS BR.(B00573SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.), SAMAR19IJ0032 · ₱5,799,064.35 · mapped
- (RE-ADVERTISED) CONSTRUCTION OF MULTI- PURPOSE BUILDING IN BRGY. BINALIW, CALBAYOG CITY, SAMAR 1ST LD17IJ0028 · ₱5,670,635.76
- CONSTRUCTION OF ONE (1) STOREY-TWO (2) CLASSROOM SCHOOL BUILDING, MATUGUINAO CENTRAL ELEMENTARY SCHOOL, MATUGUINAO, SAMAR22IJ0099 · ₱5,251,033.66 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. BUENAS AIRES, VICTORIA NORTHERN SAMAR25IH0077 · ₱4,939,779.09 · mapped
- LOCAL PROGRAM:LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURE/FACILITIES, CONSTRUCTION OF SEA WALL .BRGY. MANGUINO-O,CALBAYOG CITY,SAMAR19IJ0175 · ₱4,913,781.17 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY ARTS AND CULTURAL OFFICE, BRGY. CENTRAL, CALBAYOG CITY, SAMAR18IJ0084 · ₱4,676,511.00 · mapped
- LOCAL PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN LUIS, PAGSANGHAN, SAMAR20IJ0036 · ₱4,653,000.00 · mapped
- CONCRETING OF BRGY. CANIPULAN - BRGY. PANARUAN FMR, BRGY. CANIPULAN & PANARUAN, STA. MARGARITA, SAMAR 1ST LD17IJ0106 · ₱4,539,352.00
- CONCRETING OF BRGY. CABUNGA-AN - SITIO MACTANG FMR, BRGY. CABUNGA-AN, STO. NIÑO, SAMAR17IJ0118 · ₱4,508,799.81
- CLUSTER 2: CSSP CONSTRUCTION /REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM22IJ0102 · ₱4,387,177.90 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - REPAIR/REHAB. OF ROAD, BRGY. GUINBAOYAN NORTE, CALBAYOG CITY, SAMAR 1ST LD15IJ0246 · ₱4,383,410.21
- CONSTRUCTION OF ONE(1) STOREY - THREE(3) CLASSSROOM SCHOOL BUILDING WITH TOILET, MALAJOG ELEMENTARY SCHOOL, CALBAYOG CITY, SAMAR17IJ0159 · ₱4,080,912.00
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), JIMAUTAN ELEMENTARY SCHOOL, CALBAYOG CITY, SAMAR20IJ0089 · ₱3,959,998.00 · mapped
- CLUSTER: CSSP CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM22IJ0096 · ₱3,137,895.30 · mapped
- CONSTRUCTION OF ROAD, BRGY. ARELLANO TO BRGY. SOMOROY, BOBON, NORTHERN SAMAR25IH0071 · ₱2,959,354.60 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM SCHOOL BUILDING (WITH TOILET), CAGBILWANG PRIMARY SCHOOL, CALBAYOG CITY, SAMAR17IJ0175 · ₱2,892,988.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. CENTRAL CALBAYOG CITY, SAMAR 1ST LD17IJ0038 · ₱2,891,685.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BISITAHAN, TARANGNAN, SAMAR19IJ0028 · ₱2,833,380.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
