DPWH projects in Taguig City
68 DPWH public works projects are recorded in Taguig City (National Capital Region), with start dates from 2022 to 2024. Recorded contract values total about ₱5,685,573,350.08. 68 are recorded at 100% progress and 9 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 3), Taguig City₱141,854,632.50
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 1), Taguig City₱141,811,101.20
- Construction of Slope Protection at Lakeshore, Barangay Hagonoy, Taguig City₱141,782,501.10
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 2), Taguig City₱141,782,110.50
- Construction of Slope Protection Along Pinagsama River, Taguig City (Phase 2)₱125,754,544.80
- Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 5, Taguig City₱96,500,000.00
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 3, Taguig City₱96,500,000.00
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 6, Taguig City₱96,500,000.00
- Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 2, Taguig City₱96,500,000.00
- Construction of Pumping Station and Flood Control Structure at Bagumbayan River Including Upgrading of Drainage Outfall / Laterals, Brgy. Bagumbayan, Taguig City₱96,500,000.00
- Construction of Slope Protection at Hagonoy Pumping Station Retarding Pond, Taguig City (Package 3)₱94,570,000.00
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 7), Taguig City₱94,569,774.62
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 5), Taguig City₱94,569,576.09
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 6), Taguig City₱94,569,489.50
- Construction of Slope Protection Along C-6 Open Channel (Phase 11), Taguig City₱94,569,472.40
- Construction of Slope Protection Along Sta. Ana River, Taguig City (Phase 1)₱94,568,457.67
- Construction of Slope Protection Along Taguig River (Phase 1), Taguig City₱94,568,185.19
- Construction of Slope Protection Along Taguig River (Phase 3), Taguig City₱94,567,799.19
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 8), Taguig City₱94,559,906.54
- Construction of Slope Protection Structure Along Labasan River (East Bank) Package 3, Taguig City₱94,550,679.00
- Construction of Slope Protection Along C-6 Open Channel (Phase 9), Taguig City₱94,550,181.71
- Construction of Slope Protection Structure Along C-6 Open Channel, (Phase 4), Taguig City₱94,550,154.65
- Construction of Slope Protection Along C-6 Open Channel (Phase 10), Taguig City₱94,521,200.80
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 5, Taguig City₱94,190,038.78
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 2, Taguig City₱91,674,599.88