DAHL CONST CORP FORMERLY: DAHL CONST is listed as a company organization in Philippine public procurement records on this site, with 148 linked DPWH project(s) totaling about ₱4,821,960,774.60. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
DAHL CONST CORP FORMERLY: DAHL CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 148
- Total value
- ₱4,821,960,774.60
- Published flags
- 1
- Region
- Metro Manila 1st DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for DAHL CONST CORP FORMERLY: DAHL CONST — not an accusation or finding of wrongdoing.
Score: 89.30 / 100 · Projects in sample: 148 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 81.3/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 81.3
- lateCompletedProjects
- 16
- onTimeCompletedProjects
- 114
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 140
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 7
- Termination rate
Component score: 98/100 · Weight: 21%
- totalProjects
- 148
- componentScore
- 98
- terminatedProjects
- 1
- terminationRatePct
- 0.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 147
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 148
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 148
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 140 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF RETARDING BASIN AT ESTERO DE KABULUSAN, PHASE II, TONDO, MANILA CITY25OE0060 · ₱142,056,145.35 · mapped
- Construction of Slope Protection along Pinagsama River, Taguig City (Phase 2)24OB0214 · ₱125,754,544.80 · mapped
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 3, Taguig City22OB0104 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 1), TAGUIG CITY24OB0185 · ₱94,569,660.72 · mapped
- Construction of Slope Protection along Taguig River (Phase 1), Taguig City24OB0182 · ₱94,568,185.19 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (WEST BANK), PHASE 2, PACKAGE 7, TAGUIG CITY25OB0257 · ₱93,604,844.71 · mapped
- Construction of Slope Protection Along Taguig River, Facing Downstream (West Bank), Package 2, Taguig City22OB0103 · ₱91,674,599.88 · mapped
- Construction of Slope Protection at Taguig River Laguna Lakeshore, Taguig City, Phase II23OB0434 · ₱91,674,420.38 · mapped
- Construction of Slope Protection along Napindan River, Package 1, Taguig City23OB0448 · ₱91,636,178.26 · mapped
- Construction of Slope Protection at Taguig River Laguna Lakeshore, Taguig City, Phase I23OB0433 · ₱91,578,156.14 · mapped
- Construction of Slope Protection along Napindan River, Package 2, Taguig City23OB0449 · ₱91,577,987.28 · mapped
- REHABILITATION OF C-6 OPEN CHANNEL, TAGUIG CITY (PHASE 15)22OB0165 · ₱91,577,972.74 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER (EAST BANK), PACKAGE 1, TAGUIG CITY21OB0074 · ₱91,530,006.02 · mapped
- CONSTRUCTION OF SLOPE PROTECTION INCLUDING SITE DEVELOPMENT ALONG LAGUNA LAKESHORE (PACKAGE 1), LOWER BICUTAN, TAGUIG CITY21OB0076 · ₱91,520,289.02 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER (WEST BANK), PACKAGE 1, TAGUIG CITY21OB0075 · ₱91,472,328.06 · mapped
- REHABILITATION OF C-6 OPEN CHANNEL, TAGUIG CITY (PHASE 14)22OB0164 · ₱89,924,183.32 · mapped
- REHABILITATION OF C-6 OPEN CHANNEL, TAGUIG CITY (PHASE 12)22OB0162 · ₱89,756,088.35 · mapped
- Construction of Flood Control Structure, Santa Maria River, Lalakhan Section, Santa Maria, Bulacan23CD0088 · ₱86,848,281.05 · mapped
- Construction of Slope Protection Along Pateros River, (Phase 2), Taguig City24OB0181 · ₱70,926,646.27 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (GYMNASIUM / EVACUATION CENTER) AT MRB, BARANGAY COMMONWEALTH, QUEZON CITY23OF0037 · ₱66,198,975.00 · mapped
- CONSTRUCTION OF RETARDING BASIN AT ESTERO DE MAYPAJO, TONDO, MANILA CITY (PHASE VI)25OE0110 · ₱56,740,053.20 · mapped
- Construction of Slope Protection along Bagumbayan River (Phase 1), Taguig City22OB0130 · ₱49,000,000.00 · mapped
- Bank Improvement/Protection along Panday River (West Bank), Taguig City22OB0155 · ₱48,999,982.49 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT TESDA COMPOUND, TAGUIG CITY, METRO MANILA24OB0468 · ₱48,757,424.93 · mapped
- CONSTRUCTION OF DRAINAGE OUTFALL INCLUDING LATERALS, BARANGAY BAGUMBAYAN, TAGUIG CITY24OB0161 · ₱48,018,892.68 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, TAGUIG CITY UNIVERSITY, HALL OF JUSTICE/TCU/ TAGUIG CITY COMPOUND, PHASE III, GEN. LUNA ST., UPPER BICUTAN, TAGUIG CITY19OB0180 · ₱47,791,865.91 · mapped
- CONSTRUCTION OF MULTI PURPOSE FACILITY (COVERED COURT/SPORTS CENTER), NATIONAL CENTER FOR MENTAL HEALTH COMPOUND, MANDALUYONG CITY23OB0190 · ₱47,529,420.42 · mapped
- Improvement of Slope Protection along Buli Creek, Phase 2, Pasig City24OB0108 · ₱47,524,950.00 · mapped
- Improvement of Slope Protection along Buli Creek, Phase 1, Pasig City24OB0107 · ₱47,524,455.00 · mapped
- REHABILITATION OF ROAD NETWORK AT BARANGAY NEW LOWER BICUTAN, TAGUIG CITY25OB0160 · ₱47,517,490.37 · mapped
- REHABILITATION OF HAKBANGAN CREEK, PASIG CITY25OB0260 · ₱47,511,629.01 · mapped
- CONSTRUCTION OF STO. ROSARIO SILANGAN MULTI-PURPOSE BUILDING AT BARANGAY STO. ROSARIO SILANGAN, PATEROS, METRO MANILA23OB0334 · ₱47,506,205.62 · mapped
- CONSTRUCTION OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BRGY. SAN ROQUE, TAGUIG CITY20OB0325 · ₱47,470,998.30 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ROQUE, TAGUIG CITY20OB0342 · ₱47,470,991.67 · mapped
- REHABILITATION OF ROADS AT BARANGAY KATUPARAN, TAGUIG CITY20OB0375 · ₱47,019,951.07 · mapped
- Rehabilitation of Flood Control Structure along Buli Creek, Pasig City Phase II23OB0088 · ₱46,535,105.00 · mapped
- Construction of Slope Protection along Salapan Creek, Barangay Salapan, San Juan City23OB0110 · ₱46,526,297.54 · mapped
- REHABILITATION/CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER EAST BANK (PACKAGE I), BARANGAY USUSAN, TAGUIG CITY21OB0101 · ₱46,500,866.92 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - LOPEZ-JAENA - K0015 + (-266) - K0015 + 96225OB0066 · ₱46,463,376.67 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM AND LATERALS, BRGY. KATUPARAN, TAGUIG CITY20OB0355 · ₱45,837,211.54 · mapped
- CONSTRUCTION OF SLOPE PROTECTION OF TAGUIG LINEAR PARK/JOGGING LANE ALONG LAGUNA LAKE, TAGUIG CITY18OB0253 · ₱45,764,322.34 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, (PHASE II), BRGY. SAN PEDRO PATEROS, METRO MANILA19OB0120 · ₱45,726,454.77 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER (M.L. QUEZON BRIDGE), PHASE IV, BRGY. TUKTUKAN, TAGUIG CITY19OB0174 · ₱45,720,883.73 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER EAST BANK (FACING DOWNSTREAM), TAGUIG CITY19OB0176 · ₱45,716,208.05 · mapped
- CONSTRUCTION OF SLOPE PROTECTION INCLUDING BANK IMPROVEMENT ALONG TAGUIG RIVER EAST BANK FACING DOWNSTREAM, PHASE II, TAGUIG CITY19OB0184 · ₱45,643,849.55 · mapped
- BANK IMPROVEMENT/PROTECTION ALONG PATEROS RIVER, BRGY. AGUHO, (PHASE IV), PATEROS, METRO MANILA19OB0119 · ₱45,595,950.63 · mapped
- Improvement of Maytunas Creek, Mandaluyong City (Phase 1)22OB0026 · ₱42,808,974.20 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MANILA EAST RD - K0047+305 - K0048+30023DO0063 · ₱39,505,760.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT, ESTERO DE KABULUSAN, STA. 0+080.80 TO 0+133.60, MANILA CITY19OE0001 · ₱39,182,240.51 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AND SITE DEVELOPMENT, BRGY. LIGID-TIPAS, TAGUIG CITY20OB0333 · ₱37,976,878.33 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →