Flood Control and Drainage20EI0095

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF BRGY. BALITE FLOOD CONTROL, GLORIA, ORIENTAL MINDORO

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF BRGY. BALITE FLOOD CONTROL, GLORIA, ORIENTAL MINDORO is a DPWH-tracked public work in Southern Mindoro DEO, Region IV-B. Reported contract value: ₱39,199,451.93. Status: Reported complete (DPWH). Contractor on record: SIXTEEN ENT-CALAPAN BRANCH. Figures trace to dpwh.

Southern Mindoro DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱40,000

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-D-20-0002741 · ₱257,273,406 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20EI0095 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-03-11 → 2023-12-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Oriental Mindoro

Based on the coordinates published with the DPWH record and NOAH file OrientalMindoro.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF BRGY. BALITE FLOOD CONTROL, GLORIA, ORIENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Brgy. Balite Flood Control, Gloria, Oriental Mindoro
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-D-20-0002741

₱257,273,406.00 · FY2020

Released to Southern Mindoro DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

76 projects · ₱2.7B total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-780)-KO064+(-320); KO064+(-200)-KO064+328; KO064+456-KO064+638; KO064+822-KO066+680; KO066+868-KO069+053; KO069+356-KO071+160; KO071+273-KO072+128; KO072+241-KO072+445; KO072+628-KO073+687; KO073+794-KO074+640,

Region IV-B, Region IV-B

2018₱204.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM- CONST. OF MISSING LINKS/NEW ROADS- BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), ORIENTAL MINDORO

Region IV-B, Region IV-B

2023₱135.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), STA. 0+000-STA. 0+044.60; STA. 0+105.40-STA. 1+302; STA. 0+066.60-STA. 0+105.40, ORIENTAL MINDORO

Region IV-B, Region IV-B

2021₱96.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF SECONDARY ROADS, CSR (K0094+160 - K0094+191, K0094+200 - K0096+968), BANSUD, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱96.4M
Reported complete (DPWH)
No sat.

WIDENING OF CALAPAN SOUTH ROAD, SECT. 1-KO085+938-KO086+336; SECT. 2-KO086+657-KO086+846; SECT. 3-KO086+887-KO087+364; SECT. 4-KO087+861-KO088+690; SECT. 5-KO089+171-KO089+764; SECT. 6-KO090+287-KO090+390; SECT. 7-KO090+803-KO091+127; SECT. 8-KO091+578-KO

Southern Mindoro DEO, Region IV-B

2017₱93.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CALAPAN SOUTH ROAD, K0103+632 - K0104+224, K0124+976 - K0126+000, K0127+000 - K0127+400, K0127+560 - K0130+000), BONGABONG, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱92.4M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱39,199,451.93

Progress

Reported complete (DPWH)

Start Date

February 20, 2020

Target End

December 18, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOriental MindoroGloriaNarra
Storms whose wind field reached it
Koto 2025Fung-Wong 2025Fengshen 2025Bualoi 2025Prapiroon 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.