Flood Control and Drainage24AI0271

CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C)

CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) is a DPWH-tracked public work in Pangasinan 3rd DEO, Region I. Reported contract value: ₱95,417,337.92. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: VILLAR GEN CONST AND SUPPLIES. Figures trace to dpwh.

Pangasinan 3rd DEO, Region I
Region: Region I

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱25,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-24-0002494 · ₱1,237,218 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱95,417,338 · JHI CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-02-11 → 2026-10-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Pangasinan

Based on the coordinates published with the DPWH record and NOAH file Pangasinan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Banila River, Brgy. Mauban, Balungao, Pangasinan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-24-0002494

₱1,237,218.00 · FY2024

Released to Regional Office XI - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CONSTRUCTION OF RIVER SLOPE/ BANK PROTECTION STRUC

₱95,417,337.92 · JHI CONSTRUCTION & SUPPLY

Award / contract ref: 24AI0271

Contractor

B

493 projects · ₱8.0B total · 42 flags

4. Implementation

Contract Amount

₱95,417,337.92

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

December 19, 2024

Target End

September 28, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanBalungaoKita-kita
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.