Flood Control and Drainage20OA0103

CONSTRUCTION OF TANZA ROAD DIKE (PHASE 4) BRGY. TANZA, NAVOTAS CITY

CONSTRUCTION OF TANZA ROAD DIKE (PHASE 4) BRGY. TANZA, NAVOTAS CITY is a DPWH-tracked public work in Malabon-Navotas DEO, National Capital Region. Reported contract value: ₱24,629,214.53. Status: Reported complete (DPWH). Contractor on record: PRIME PACIFIC MARINE. Figures trace to dpwh.

Malabon-Navotas DEO, National Capital Region
Region: National Capital Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.68

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-20-0001567 · ₱876,400 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20OA0103 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-30 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · NCR, Third District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TANZA ROAD DIKE (PHASE 4) BRGY. TANZA, NAVOTAS CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 68%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Tanza Road Dike (Phase 4), Brgy. Tanza, Navotas City
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-20-0001567

₱876,400.00 · FY2020

Released to Regional Office IX (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

22 projects · ₱936.5M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF NAVOTAS COASTAL DIKE, NAVOTAS CITY (STA. 0+508.50 - STA. 520.70 - STA. 1+453.60 - STA. 1+523, STA. 1+535.00 - STA. 1+540.00, STA. 1+595.70 - STA. 1+622.50, STA 3+021.40 - STA. 3+295.00)

Flood Control Management Cluster, Central Office

2019₱137.5M
Past target date (DPWH On-Going)
No sat.

CONTRUCTION OF REVETMENT AND IMPROVEMENTS ALONG BACOOR RIVER HABAY II PHASE I BACOOR CAVITE AND CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BACOOR RIVER HABAY II PHASE II BACOOR CAVITE

Region IV-A, Region IV-A

2019₱78.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIV

Cavite 3rd DEO, Region IV-A

2021₱77.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIV

Cavite 3rd DEO, Region IV-A

2021₱77.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF REVETMENT ALONG SAN ISIDRO RIVER, PHASE 2, BARANGAY MADERAN, GENERAL MARIANO ALVAREZ, CAVITE

Cavite 3rd DEO, Region IV-A

2023₱67.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG METIZO RIVER, B

Cavite 3rd DEO, Region IV-A

2020₱50.9M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱24,629,214.53

Progress

Reported complete (DPWH)

Start Date

January 18, 2021

Target End

August 2, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF TANZA ROAD DIKE (PHASE 4) BRGY. TANZA, NAVOTAS CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/1c969c7b-f07c-4762-a16a-3ec9caea9055

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of NavotasTanza 2
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.