Flood Control and Drainage21DQ0026

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIV

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIV is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱77,199,992.99. Status: Reported complete (DPWH). Contractor on record: PRIME PACIFIC MARINE. Figures trace to dpwh.

Cavite 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21DQ0026 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Cavite

Based on the coordinates published with the DPWH record and NOAH file Cavite.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIV

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures and Drainage Systems along Cavite-Batangas Road, K0044 + 800 - K0045 + 100 with exceptions, Silang, Cavite
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Cavite 3rd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

22 projects · ₱936.5M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF NAVOTAS COASTAL DIKE, NAVOTAS CITY (STA. 0+508.50 - STA. 520.70 - STA. 1+453.60 - STA. 1+523, STA. 1+535.00 - STA. 1+540.00, STA. 1+595.70 - STA. 1+622.50, STA 3+021.40 - STA. 3+295.00)

Flood Control Management Cluster, Central Office

2019₱137.5M
Past target date (DPWH On-Going)
No sat.

CONTRUCTION OF REVETMENT AND IMPROVEMENTS ALONG BACOOR RIVER HABAY II PHASE I BACOOR CAVITE AND CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BACOOR RIVER HABAY II PHASE II BACOOR CAVITE

Region IV-A, Region IV-A

2019₱78.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIV

Cavite 3rd DEO, Region IV-A

2021₱77.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF REVETMENT ALONG SAN ISIDRO RIVER, PHASE 2, BARANGAY MADERAN, GENERAL MARIANO ALVAREZ, CAVITE

Cavite 3rd DEO, Region IV-A

2023₱67.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG METIZO RIVER, B

Cavite 3rd DEO, Region IV-A

2020₱50.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TANZA ROAD DIKE (PHASE 3) BRGY. TANZA 2, NAVOTAS CITY

Malabon-Navotas DEO, National Capital Region

2020₱48.6M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱77,199,992.99

Progress

Reported complete (DPWH)

Start Date

March 22, 2021

Target End

March 21, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of CarmonaLantic
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Trami 2024
Hazard exposure
Active faultFlood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.