CONSTRUCTION OF FLOOD STRUCTURE ALONG CASINI RIVER (LEFT SIDE - DOWNSTREAM), IROSIN, SORSOGON
CONSTRUCTION OF FLOOD STRUCTURE ALONG CASINI RIVER (LEFT SIDE - DOWNSTREAM), IROSIN, SORSOGON is a DPWH-tracked public work in Sorsogon 2nd DEO, Region V. Reported contract value: ₱46,960,454.66. Status: Reported complete (DPWH). Contractor on record: STEVEN CONST. Figures trace to dpwh.
Total Contract Cost

