Flood Control and Drainage25OH0083

CONSTRUCTION OF BOOSTER PUMPING STATION ALONG ESTERO DE PANDACAN, PACKAGE 2B, MANILA CITY

CONSTRUCTION OF BOOSTER PUMPING STATION ALONG ESTERO DE PANDACAN, PACKAGE 2B, MANILA CITY is a DPWH-tracked public work in South Manila DEO, National Capital Region. Reported contract value: ₱142,798,555.20. Status: Past target date (DPWH On-Going). Contractor on record: GOLDEN J'S CONST SERVICES 51135. Figures trace to dpwh.

South Manila DEO, National Capital Region
Region: National Capital Region

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Estero de Sunog Apog, Barangay 172, Manila City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

South Manila DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 51135

34 projects · ₱2.8B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE- SECONDARY ROADS- MOGPOG-BALANACAN PORT OAD- K0012+763=-K0013+500 (INTERMITTENT SECTIONS), MARINDUQUE

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURE ALONG MINDORO WEST COASTAL ROAD, K0353+000-K0369+000 (INTERMITTENT SECTIONS), OCC. MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, STA. 000+000-STA. 000+368.64, BANSUD, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. TAMBONG, STA. 000=000-STA. 000+332.94, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.2M
Past target date (DPWH On-Going)
No sat.

CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.2M
Past target date (DPWH On-Going)
No sat.

CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.0M
Past target date (DPWH On-Going)
View all 34 projects →

4. Implementation

Contract Amount

₱142,798,555.20

Progress

Past target date (DPWH On-Going)

Start Date

May 27, 2025

Target End

September 23, 2025

5. Audit