CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. SAN JOSE, CABA, LA UNION PACKAGE 3
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. SAN JOSE, CABA, LA UNION PACKAGE 3 is a DPWH-tracked public work in La Union 2nd DEO, Region I. Reported contract value: ₱46,734,637.63. Status: Reported complete (DPWH). Contractor on record: E E MADAYAG CONST. Figures trace to dpwh.
Total Contract Cost
