Flood Control and Drainage19OF0026

CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERCEPTORS (ALIGNMENT ALONG DAPITAN STREET, MAYON STREET AND N. ROXAS STREET), Q.C.

CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERCEPTORS (ALIGNMENT ALONG DAPITAN STREET, MAYON STREET AND N. ROXAS STREET), Q.C. is a DPWH-tracked public work in Quezon City 1st DEO, National Capital Region. Reported contract value: ₱9,505,504.33. Status: Reported complete (DPWH). Contractor on record: C A MIGUEL CONST INC FOR C A MIGUEL CON. Figures trace to dpwh.

Quezon City 1st DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0004171 · ₱46,809,683 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,505,504 · C.A. MIGUEL CONSTRUCTION,

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · NCR, City of Manila, First District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERCEPTORS (ALIGNMENT ALONG DAPITAN STREET, MAYON STREET AND N. ROXAS STREET), Q.C.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0004171

₱46,809,683.00 · FY2019

Released to Jose R. Reyes Memorial Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19OF0026 Construction of Drainage Structure – Cons

₱9,505,504.33 · C.A. MIGUEL CONSTRUCTION,

Award / contract ref: 19OF0026

Contractor

B

20 projects · ₱152.9M total · 0 flags

4. Implementation

Contract Amount

₱9,505,504.33

Progress

Reported complete (DPWH)

Start Date

June 6, 2019

Target End

January 1, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERCEPTORS (ALIGNMENT ALONG DAPITAN STREET, MAYON STREET AND N. ROXAS STREET), Q.C..” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/40c7042d-743b-440e-8c06-9dae74d3fd61

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)Quezon CitySanta Teresita
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.