Construction of Flood Control Structure along Talavera River, Brgy. Tabulac, San Jose City, Nueva Ecija
Construction of Flood Control Structure along Talavera River, Brgy. Tabulac, San Jose City, Nueva Ecija is a DPWH-tracked public work in SAN JOSE CITY (NUEVA ECIJA), NUEVA ECIJA, Region III. Reported contract value: ₱39,092,350.45. Status: Reported complete (DPWH). Contractor on record: IJK MAE CONST INC / NIÑAS CONST CORP FORMERLY: NINA'S CONST AND SUPPLIES. Figures trace to sumbong.
Total Contract Cost

