Flood Control and Drainage18CK0051

REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (RIGHT BANK, MACALONG SECTION), LAPAZ, TARLAC

REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (RIGHT BANK, MACALONG SECTION), LAPAZ, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱46,538,591.22. Status: Reported complete (DPWH). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.

Tarlac 2nd DEO, Region III
Region: Region III

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-18-0029562 · · release to the district office, not itemized per project

    Possible match · score 0.79

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱46,538,591 · STO. CRISTO CONSTRUCTION AND TRADING .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-02-23 → 2025-06-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Nueva Ecija

Based on the coordinates published with the DPWH record and NOAH file NuevaEcija.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (RIGHT BANK, MACALONG SECTION), LAPAZ, TARLAC

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/Improvement of Existing Dike along Rio Chico River (Right Bank, Macalong Section), La Paz, Tarlac
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-18-0029562

₱0.00 · FY2018

Released to Division of Tarlac (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

18CK0051

₱46,538,591.22 · STO. CRISTO CONSTRUCTION AND TRADING .

Award / contract ref: 18CK0051

Contractor

A

490 projects · ₱18.9B total · 0 flags

Other projects by this contractor

View all 490 projects →

4. Implementation

Contract Amount

₱46,538,591.22

Progress

Reported complete (DPWH)

Start Date

February 15, 2018

Target End

July 11, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaZaragoza
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.