Flood Control and Drainage20IA0016

CONSTRUCTION OF FLOOD CONTROL, SITIO COGON, BRGY. CALUMPANG

CONSTRUCTION OF FLOOD CONTROL, SITIO COGON, BRGY. CALUMPANG is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱9,465,250.00. Status: Reported complete (DPWH). Contractor on record: MKB BUILDERS AND SUPPLY. Figures trace to dpwh.

Biliran DEO, Region VIII
Region: Region VIII

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱10,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱9,465,250 · MKB BUILDERS AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-03-28 → 2025-11-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Biliran

Based on the coordinates published with the DPWH record and NOAH file Biliran.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL, SITIO COGON, BRGY. CALUMPANG

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Sitio Cogon, Brgy. Calumpang, Naval, Biliran
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Biliran DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20IA0016 Construction of Flood Control, Sitio Cogo

₱9,465,250.00 · MKB BUILDERS AND SUPPLY

Award / contract ref: 20IA0016

4. Implementation

Contract Amount

₱9,465,250.00

Progress

Reported complete (DPWH)

Start Date

February 19, 2020

Target End

August 16, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)BiliranNavalLarrazabal
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.