Flood Control and Drainage17OE0068

MFO 2 - FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CONSTANCIA DRAINAGE MAIN (RCBC) PHASE II, MANILA CITY, SAMPALOC, MANILA CITY

MFO 2 - FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CONSTANCIA DRAINAGE MAIN (RCBC) PHASE II, MANILA CITY, SAMPALOC, MANILA CITY is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱97,211,978.77. Status: Reported complete (DPWH). Contractor on record: ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-17-0002549 · · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱97,211,979 · FLORDES CONSTRUCTION AND TRADING .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-05-03 → 2020-06-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · NCR, City of Manila, First District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MFO 2 - FLOOD MANAGEMENT SERVICES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CONSTANCIA DRAINAGE MAIN (RCBC) PHASE II, MANILA CITY, SAMPALOC, MANILA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure-Earnshaw Drainage Main (RCBC) Phase III, Manila
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-17-0002549

₱0.00 · FY2017

Released to Division of Mariki (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Flood Management Services

₱97,211,978.77 · FLORDES CONSTRUCTION AND TRADING .

Award / contract ref: 17OE0068

Contractor

B

103 projects · ₱10.5B total · 4 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF THE NBI MAIN BUILDING (PHASE I)

National Capital Region, National Capital Region

2023₱447.7M
Past target date (DPWH On-Going)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURES AL;ONG PUERTO PRINCESA SDOUTH ROAD, K0147+398-K0180+313 (WITH EXCEPTIONS), PALAWAN

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURE ALONG PUERTO PRINCESA SOUTH ROAD- K0180+313-K0203+730 (INTERMITTENT SECTIONS), PALAWAN

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PRIMARY ROADS, DAANG MAHARLIKA (LZ), NUEVA ECIJA 2ND LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA

Region III, Region III

2017₱289.5M
Reported complete (DPWH)
No sat.

CLUSTER 1: 1. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PALO - PASTRANA - STA. FE BY-PASS RD, PACKAGE A 2. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATION

Region VIII, Region VIII

2025₱289.4M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 2

Region II, Region II

2023₱285.9M
Past target date (DPWH On-Going)
View all 103 projects →

4. Implementation

Contract Amount

₱97,211,978.77

Progress

Reported complete (DPWH)

Start Date

July 17, 2017

Target End

March 13, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaSampalocBarangay 441
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.