Rehabilitation of Existing Dike along O'Donnell River (Bueno Section, Left Bank), Phase 8, Capas, Tarlac
Rehabilitation of Existing Dike along O'Donnell River (Bueno Section, Left Bank), Phase 8, Capas, Tarlac is a DPWH-tracked public work in CAPAS (TARLAC), TARLAC, Region III. Reported contract value: ₱96,497,506.83. Status: Reported complete (DPWH). Contractor on record: E L ANOLIN CONST. Figures trace to sumbong.
Total Contract Cost
