Flood Control and Drainage20IG0007

CONSTRUCTION OF BAGALONGON FLOOD CONTROL STRUCTURES, ABUYOG, LEYTE

CONSTRUCTION OF BAGALONGON FLOOD CONTROL STRUCTURES, ABUYOG, LEYTE is a DPWH-tracked public work in Leyte 5th DEO, Region VIII. Reported contract value: ₱17,798,643.29. Status: Reported complete (DPWH). Contractor on record: FAIRCHILD BUILDERS. Figures trace to dpwh.

Leyte 5th DEO, Region VIII
Region: Region VIII

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱19,207

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱17,798,169 · FAIRCHILD BUILDERS & DEVELOPERS INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-05 → 2025-08-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Leyte

Based on the coordinates published with the DPWH record and NOAH file Leyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BAGALONGON FLOOD CONTROL STRUCTURES, ABUYOG, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱19,207,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bagalongon Flood Control Structures, Abuyog, Leyte
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Leyte 5th DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of

₱17,798,168.88 · FAIRCHILD BUILDERS & DEVELOPERS INC

Award / contract ref: 20IG0007

Contractor

C

76 projects · ₱2.5B total · 0 flags

4. Implementation

Contract Amount

₱17,798,643.29

Progress

Reported complete (DPWH)

Start Date

February 26, 2020

Target End

July 24, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteAbuyogBalinsasayao
Storms whose wind field reached it
Nokaen 2026Koto 2025Kalmaegi 2025Bualoi 2025Ewiniar 2024
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.