ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LIPLIPOKEN FLOOD CONTROL ALONG SALTAN RIVER (STA. 3 + 980 - STA. 4 + 980), PINUKP
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LIPLIPOKEN FLOOD CONTROL ALONG SALTAN RIVER (STA. 3 + 980 - STA. 4 + 980), PINUKP is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱61,597,115.75. Status: Past target date (DPWH On-Going). Contractor on record: BHM CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
