Construction of Flood Mitigation Structure21OC0049

Construction of Revetment Wall at Barangay Rizal Pumping Station (Downstream Portion), Brgy. Rizal, Makati City

Construction of Revetment Wall at Barangay Rizal Pumping Station (Downstream Portion), Brgy. Rizal, Makati City is a DPWH-tracked public work in MAKATI CITY, National Capital Region. Reported contract value: ₱21,412,893.00. Status: Reported complete (DPWH). Contractor on record: C B TAMPENGCO CONST & SUPPLY. Figures trace to sumbong.

MAKATI CITY, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱1,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-21-0014158 · ₱35,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱21,412,893 · C.B. TAMPENGCO CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-10-29 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Pumping station, cost per station (new construction)

₱21,412,893 per station= 0.6x the National Capital Region median (n=119)

Contract cost ₱21,412,893 ÷ 1 station read from the DPWH title (“PUMPING STATION”; single new pumping station named in title). National percentile: 27. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, Fourth District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Revetment Wall at Barangay Rizal Pumping Station (Downstream Portion), Brgy. Rizal, Makati City

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱1,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Wall along Creeks in Brgy. Maysan, Valenzuela City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0014158

₱35,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-21-0000398

₱1,301,785.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-21-0000333

₱318,775.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-21-0004663

₱158,338.00 · FY2021

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Revetment Wall

₱21,412,893.00 · C.B. TAMPENGCO CONSTRUCTION & SUPPLY

Award / contract ref: 21OC0049

4. Implementation

Contract Amount

₱21,412,893.00

Progress

Reported complete (DPWH)

Start Date

March 22, 2022

Target End

January 4, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of TaguigUsusan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.