Construction of Flood Mitigation Structure22I00091

Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte

Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte is a DPWH-tracked public work in PALO (LEYTE), LEYTE, Region VIII. Reported contract value: ₱25,725,438.95. Status: Reported complete (DPWH). Contractor on record: AICON INDUSTRIES. Figures trace to sumbong.

PALO (LEYTE), LEYTE, Region VIII
Region: Region VIII

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱49,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0003175 · ₱520,522,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱25,725,439 · AICON INDUSTRIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-16 → 2023-06-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Leyte

Based on the coordinates published with the DPWH record and NOAH file Leyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Storm Surge Protection: Tide Embankment, Subsection 5, Phase 10, Brgy. San Joaquin, Palo, Leyte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱49,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems, Construction of Flood Control Along Binahaan River, Sta. 2+800 to Sta. 3+143, Brgy. San Joaquin, Palo, Leyte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003175

₱520,522,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003115

₱30,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003139

₱25,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID No. 22I00091 (Negotiated Procurement – Two Fai

₱25,725,438.95 · AICON INDUSTRIES

Award / contract ref: CID No. 22I00091 (Negotiated Procurement – Two Fai

4. Implementation

Contract Amount

₱25,725,438.95

Progress

Reported complete (DPWH)

Start Date

December 29, 2022

Target End

June 22, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeytePaloSan Joaquin
Storms whose wind field reached it
Nokaen 2026Koto 2025Kalmaegi 2025Fengshen 2025Bualoi 2025
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.