Flood Control and Drainage21CC0224

CONSTRUCTION/MAJOR REHABILITATION OF FLOOD CONTROL, PUNGO, CALUMPIT, BULACAN

CONSTRUCTION/MAJOR REHABILITATION OF FLOOD CONTROL, PUNGO, CALUMPIT, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱9,899,264.53. Status: Reported complete (DPWH). Contractor on record: PTM DEVELOPMENT CORP. Figures trace to dpwh.

Bulacan 1st DEO, Region III
Region: Region III

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱10,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱9,602,964 · PTM DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-30 → 2025-04-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/MAJOR REHABILITATION  OF FLOOD CONTROL, PUNGO, CALUMPIT, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Major Rehabilitation of Flood Control, Pungo, Calumpit, Bulacan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Bulacan 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction/Major Rehabilitation of Flood Control

₱9,602,964.00 · PTM DEVELOPMENT CORP

Award / contract ref: 21CC0224

4. Implementation

Contract Amount

₱9,899,264.53

Progress

Reported complete (DPWH)

Start Date

January 10, 2022

Target End

May 9, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION/MAJOR REHABILITATION OF FLOOD CONTROL, PUNGO, CALUMPIT, BULACAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/8a091760-0637-4c62-8f37-f4fb8ad881ea

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCalumpitPungo
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.