GAA 2025 OO-225KL0008

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER, BARANGAY BENIGWAYAN SECTION (PACKAGE 2), ALUBIJID, MISAMIS ORIENTAL

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER, BARANGAY BENIGWAYAN SECTION (PACKAGE 2), ALUBIJID, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 2nd DEO, Region X. Reported contract value: ₱48,481,681.53. Status: Past target date (DPWH On-Going). Contractor on record: ROAD EDGE TRADING & DEVELOPMENT SERVICES. Figures trace to dpwh.

Misamis Oriental 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.98

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25KL0008 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    99% reported · imagery 2023-11-14 → 2025-10-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER, BARANGAY BENIGWAYAN SECTION (PACKAGE 2), ALUBIJID, MISAMIS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Alubijid River, Barangay Benigwayan Section (Package 2), Alubijid, Misamis Oriental
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Misamis Oriental 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

83 projects · ₱5.7B total · 15 flags

4. Implementation

Contract Amount

₱48,481,681.53

Progress

Past target date (DPWH On-Going)

Start Date

February 3, 2025

Target End

November 9, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OrientalAlubijidBenigwayan
Storms whose wind field reached it
Koto 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.