Flood Control and Drainage21CF0076

CONSTRUCTION OF FLOOD CONTROL, BARANGAY JULO, MUNICIPALITY OF SAN ANTONIO, NUEVA ECIJA

CONSTRUCTION OF FLOOD CONTROL, BARANGAY JULO, MUNICIPALITY OF SAN ANTONIO, NUEVA ECIJA is a DPWH-tracked public work in Nueva Ecija 2nd DEO, Region III. Reported contract value: ₱4,873,771.67. Status: Reported complete (DPWH). Contractor on record: D B BARAQUIEL CONST. Figures trace to dpwh.

Nueva Ecija 2nd DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱5,000

    Probable match · score 0.98

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21CF0076 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-23 → 2023-05-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Nueva Ecija

Based on the coordinates published with the DPWH record and NOAH file NuevaEcija.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL, BARANGAY JULO, MUNICIPALITY OF SAN ANTONIO, NUEVA ECIJA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Barangay Julo, Municipality of San Antonio, Nueva Ecija
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Nueva Ecija 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

52 projects · ₱610.3M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM 7-REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - K0 097+(-881) - K0 097+000, K0 097+000 - K0 097+180, K0 098+000 - K0 098+066, K0 101+728.60 - K0 101+1003, K0 1

Nueva Ecija 2nd DEO, Region III

2024₱68.7M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PEÑARANDA RIVER, BARANGAY SINASAJAN (RIGHT), PEÑARANDA, NUEVA ECIJ

Nueva Ecija 2nd DEO, Region III

2023₱48.0M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PEÑARANDA RIVER, BARANGAY STO. TOMAS, PEÑARANDA, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2023₱47.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Flood Control Structure along Pampanga River, Barangay Bagong Sikat, Cabiao, Nueva Ecija

CABIAO (NUEVA ECIJA), NUEVA ECIJA, Region III

2023₱28.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONCRETING OF ACCESS ROADS LEADING TO MINALUNGAO NATIONAL PARK, SAN ISIDRO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱26.7M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CONCEPCION, CABIAO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2024₱24.4M
Reported complete (DPWH)
View all 52 projects →

4. Implementation

Contract Amount

₱4,873,771.67

Progress

Reported complete (DPWH)

Start Date

March 8, 2021

Target End

April 25, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaSan AntonioJulo
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.