Flood Control and Drainage22FH0015

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, AGBAN, BARAS, CATANDUANES

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, AGBAN, BARAS, CATANDUANES is a DPWH-tracked public work in Catanduanes DEO, Region V. Reported contract value: ₱39,198,759.99. Status: Reported complete (DPWH). Contractor on record: NQA CONST. Figures trace to dpwh.

Catanduanes DEO, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱40,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FH0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-04-22 → 2023-10-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    CY2023 · other

    Confirmed (exact contract ID) · score 1.00

    COA AAR source ↗

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Catanduanes

Based on the coordinates published with the DPWH record and NOAH file Catanduanes.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, AGBAN, BARAS, CATANDUANES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Agban, Baras, Catanduanes
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Catanduanes DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

49 projects · ₱900.3M total · 0 flags

Other projects by this contractor

View all 49 projects →

4. Implementation

Contract Amount

₱39,198,759.99

Progress

Reported complete (DPWH)

Start Date

March 2, 2022

Target End

September 7, 2022

5. Audit

Confirmed (exact contract ID) · 100%

COA observation (CY2023 audit, Par. 16 Technical defects/deficiencies in infrastructure projects). DPWH's action-plan response to this observation names Contract ID 22FH0015, p. 285. Excerpt: "22FH0015 - Justification submitted for evaluation"

CY2023 · p.285

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)CatanduanesBarasAgban
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Matmo 2025Bualoi 2025
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.