CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱96,500,000.00. Status: Past target date (DPWH On-Going). Contractor on record: 11-16 CONST 29646. Figures trace to dpwh.
Total Contract Cost

