Construction of Flood Mitigation Structure23CF0019

Construction of Flood Control Mitigation Structure along Pampanga River, Sta. 40+300.00-Sta. 40+634.70, Barangay Sto. Tomas South, Jaen, Nueva Ecija

Construction of Flood Control Mitigation Structure along Pampanga River, Sta. 40+300.00-Sta. 40+634.70, Barangay Sto. Tomas South, Jaen, Nueva Ecija is a DPWH-tracked public work in JAEN (NUEVA ECIJA), NUEVA ECIJA, Region III. Reported contract value: ₱72,374,624.95. Status: Reported complete (DPWH). Contractor on record: ITP CONST INC. Figures trace to sumbong.

JAEN (NUEVA ECIJA), NUEVA ECIJA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.93

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23CF0019 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-11-09 → 2025-01-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱216,237 per linear m= 1.0x the Region III median (n=202)

Contract cost ₱72,374,625 ÷ 334.7 linear m read from the DPWH title (“Sta. 40+300.00-Sta. 40+634.70”; station range length (Sta. a+b to c+d)). National percentile: 77. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Nueva Ecija

Based on the coordinates published with the DPWH record and NOAH file NuevaEcija.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Mitigation Structure along Pampanga River, Sta. 40+300.00-Sta. 40+634.70, Barangay Sto. Tomas South, Jaen, Nueva Ecija

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pampanga River, Barangay Ganduz, Pantabangan, Nueva Ecija
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Nueva Ecija 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

8 projects · ₱597.3M total · 0 flags

4. Implementation

Contract Amount

₱72,374,624.95

Progress

Reported complete (DPWH)

Start Date

March 29, 2023

Target End

December 23, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaJaen
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.