Flood Control and Drainage17DK0018

CONST/REHAB OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINSGEN. NAKAR 2(A) RIVER GENERAL NAK

CONST/REHAB OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINSGEN. NAKAR 2(A) RIVER GENERAL NAK is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱6,583,230.00. Status: Reported complete (DPWH). Contractor on record: C J CONST INC FORMERLY CLARO JOSE CONST. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-16-0020569 · ₱358,949 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DK0018 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-07-26 → 2021-06-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Quezon

Based on the coordinates published with the DPWH record and NOAH file Quezon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST/REHAB OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINSGEN. NAKAR 2(A) RIVER GENERAL NAK

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/ Improvement of Flood Control Structures at Mayon Street,District I, Quezon City
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-16-0020569

₱358,949.00 · FY2016

Released to 00 - Don Mariano Marcos Memorial State University To cover re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

22 projects · ₱363.4M total · 0 flags

4. Implementation

Contract Amount

₱6,583,230.00

Progress

Reported complete (DPWH)

Start Date

May 24, 2017

Target End

October 15, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST/REHAB OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINSGEN. NAKAR 2(A) RIVER GENERAL NAK.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/b697d670-8c92-4a42-ae73-21e455f5f6a6

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonInfantaBanugao
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.