CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (PHASE I), SAN MIGUEL, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (PHASE I), SAN MIGUEL, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱27,885,834.07. Status: Reported complete (DPWH). Contractor on record: TRIPLE 8 CONST. Figures trace to dpwh.
Total Contract Cost



