REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 3+688 - STA. 3+960 (RIGHT SIDE), OLONGAPO CITY
REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 3+688 - STA. 3+960 (RIGHT SIDE), OLONGAPO CITY is a DPWH-tracked public work in Zambales 2nd DEO, Region III. Reported contract value: ₱56,720,431.32. Status: Reported complete (DPWH). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.
Total Contract Cost

