Flood Control and Drainage24C00114

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AMRIS UPPER MAASIM SLOPE PROTECTION,SAN RAFAEL, BULACAN

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AMRIS UPPER MAASIM SLOPE PROTECTION,SAN RAFAEL, BULACAN is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱28,529,088.98. Status: Past target date (DPWH On-Going). Contractor on record: MONTADEL ENT. Figures trace to dpwh.

Region III, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱28,529,089 · MONTADEL ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    49% reported · imagery 2023-05-09 → 2025-01-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AMRIS UPPER MAASIM SLOPE PROTECTION,SAN RAFAEL, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24C00114

₱28,529,088.98 · MONTADEL ENTERPRISES

Award / contract ref: 24C00114

Contractor

B

38 projects · ₱903.6M total · 2 flags

Other projects by this contractor

Construction of Revetment along Julian River, Barangay Malagasang I-D, West Side, Imus, Cavite

IMUS CITY (CAVITE), CAVITE, Region IV-A

2023₱91.7M
Reported complete (DPWH)
No sat.

Construction of Revetment along Julian River, Brgy. Malagasang II-A, West Side, Imus, Cavite

IMUS CITY (CAVITE), CAVITE, Region IV-A

2022₱90.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY. MALAGASANG 1-F, WEST SIDE

Cavite 1st DEO, Region IV-A

2024₱72.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2021₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2020₱49.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BRIDGE/VIADUCT AND ROAD A

Cavite 1st DEO, Region IV-A

2025₱47.5M
Past target date (DPWH On-Going)
View all 38 projects →

4. Implementation

Contract Amount

₱28,529,088.98

Progress

Past target date (DPWH On-Going)

Start Date

June 3, 2024

Target End

December 29, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AMRIS UPPER MAASIM SLOPE PROTECTION,SAN RAFAEL, BULACAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/e4466785-74a7-492a-8b70-44e994a9f896

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanSan IldefonsoMaasim
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.