Flood Control and Drainage24FA0029

CLUSTER 1- REHAB./CONST./EXTENSION OF RIVER CONTROL PROTECTING BASUD BRIDGE,STO. DOMINGO. ALBAY AND BRGY. 13, BACACAY, ALBAY

CLUSTER 1- REHAB./CONST./EXTENSION OF RIVER CONTROL PROTECTING BASUD BRIDGE,STO. DOMINGO. ALBAY AND BRGY. 13, BACACAY, ALBAY is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱70,055,632.94. Status: Past target date (DPWH On-Going). Contractor on record: JORMAND CONST. Figures trace to dpwh.

Albay 1st DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱70,055,633 · JORMAND CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    83% reported · imagery 2021-02-16 → 2025-10-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER 1- REHAB./CONST./EXTENSION OF RIVER CONTROL PROTECTING BASUD BRIDGE,STO. DOMINGO. ALBAY AND BRGY. 13, BACACAY, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Facilities along Kabilugan / Velasco / Bato River Basin ( Lake Bicol ) , Barangay Awang, Malinao, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Albay 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

4. Implementation

Contract Amount

₱70,055,632.94

Progress

Past target date (DPWH On-Going)

Start Date

June 21, 2024

Target End

January 13, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbaySanto DomingoLidong
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.