Flood Control and Drainage15CD0249

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAHARLIKA ROAD, BUGA CREEK, SAN MIGUEL, BULACAN 3RD LD

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAHARLIKA ROAD, BUGA CREEK, SAN MIGUEL, BULACAN 3RD LD is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱44,596,221.81. Status: Reported complete (DPWH). Contractor on record: MRRM TRADING. Figures trace to dpwh.

Bulacan 2nd DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱48,000

    Probable match · score 0.97

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0036678 · ₱105,000 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15CD0249 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-11-02 → 2025-01-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAHARLIKA ROAD, BUGA CREEK, SAN MIGUEL, BULACAN 3RD LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 97%

UACS
18001
Amount
₱48,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Daang Maharlika Road, Buga Creek, San Miguel, Bulacan 3rd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0036678

₱105,000.00 · FY2016

Released to Bug-ang National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

79 projects · ₱2.9B total · 0 flags

Other projects by this contractor

SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN

Region III, Region III

2024₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY.

Region IV-A, Region IV-A

2018₱92.6M
Reported complete (DPWH)
No sat.

REHABILITATION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT. - STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 07+486.20 - STA. 07+634.80, STA. FE, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0008+940 - K0008+986, TABLAS ISLAND, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

CONST. OF TWO (2) UNITS FOUR (4) STOREY, SIXTEEN (16) CLASSROOM S/B AT PEDRO E. DIAZ, H/S, MUNTINLUP

Las Piñas-Muntinlupa DEO, National Capital Region

2018₱78.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+100.00 - STA. 11+200.00, STA. 11+510.00 - STA. 11+548.30, SAN AGUSTIN, ROMBLON

Romblon DEO, Region IV-B

2022₱77.2M
Reported complete (DPWH)
View all 79 projects →

4. Implementation

Contract Amount

₱44,596,221.81

Progress

Reported complete (DPWH)

Start Date

February 15, 2016

Target End

July 26, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanSan MiguelSalacot
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.