Flood Control and Drainage19AI0255

CONSTRUCTION OF DIKE WITH PROTECTION WORKS ALONG SABANGAN RIVER, BRGY. SAN RAFAEL CENTRO, SAN NICOLAS, PANGASINAN

CONSTRUCTION OF DIKE WITH PROTECTION WORKS ALONG SABANGAN RIVER, BRGY. SAN RAFAEL CENTRO, SAN NICOLAS, PANGASINAN is a DPWH-tracked public work in Pangasinan 3rd DEO, Region I. Reported contract value: ₱46,574,784.73. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST. Figures trace to dpwh.

Pangasinan 3rd DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROXII-19-0003585 · ₱602,000 · release to the district office, not itemized per project

    Possible match · score 0.75

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱46,574,785 · AMP CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-21 → 2020-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Pangasinan

Based on the coordinates published with the DPWH record and NOAH file Pangasinan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF DIKE WITH PROTECTION WORKS ALONG SABANGAN RIVER, BRGY. SAN RAFAEL CENTRO, SAN NICOLAS, PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXII-19-0003585

₱602,000.00 · FY2019

Released to Pangyan National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Dike with Protection Works along S

₱46,574,784.73 · AMP CONSTRUCTION

Award / contract ref: 19AI0255

Contractor

A

519 projects · ₱11.9B total · 7 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS / QUARANTINE FACILITIES / PUBLIC HEALTH FACILITIES - CONSTRUCTION OF THE EVACUATION AND CONVENTION CENTER, SAN LEONARDO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2024₱192.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, V. LUNA HOSPITAL COMPOUND, QUEZON CITY

Quezon City 2nd DEO, National Capital Region

2025₱145.5M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BENAY - BARANGAY PALABOT

Nueva Vizcaya 2nd DEO, Region II

2025₱142.6M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BARANGAY SAPANG. JAEN, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱120.0M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN,

Nueva Vizcaya 2nd DEO, Region II

2025₱102.1M
Past target date (DPWH On-Going)

Improvement of River Channel along Talavera River (Brgy. Cabubulaonan), Talavera, Nueva Ecija

TALAVERA (NUEVA ECIJA), NUEVA ECIJA, Region III

2023₱99.0M
Reported complete (DPWH)
View all 519 projects →

4. Implementation

Contract Amount

₱46,574,784.73

Progress

Reported complete (DPWH)

Start Date

July 3, 2019

Target End

January 10, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanNatividadRizal
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.