| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Flood Control Management Cluster | ₱1.45B | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 186 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM -CONSTRUCTION OF FLOOD CONTROL CABANBANAN STRUCTURE, CABANBANAN, GONZAGA, CAGAYAN | Cagayan 1st DEO | ₱96.5M | 58% reported progress | JWU CONST AND SUPPLY | 296 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF GUARDWALL ALONG BASCO- MAHATAO- IVANA- UYUGAN- IMNAJBU ROAD, IVANA, BATANES | Batanes DEO | ₱48.9M | 93% reported progress | DEKM CONST | 112 | Check in |
| LOCAL PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES -LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SEA WALL (PHASE I), BUGUEY, CAGAYAN | Cagayan 1st DEO | ₱48.9M | Reported complete | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 299 | Check in |
| Construction of Seawall Centro Norte, Buguey, Cagayan | BUGUEY (CAGAYAN), CAGAYAN | ₱47.5M | Reported complete | AGAFER CONST AND TRADING CORP FOR: AGAFER CONST AND TRADING | 299 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SEA WALL AT IVANA SHELTER PORT, IVANA, BATANES | Batanes DEO | ₱39.1M | 99% reported progress | J F GABOTERO INC | 116 | Check in |
| OO2:PROTECT LIVES&PROPTS AGAINST MAJ. FLDS-FLD MANAG'T PROG-CONST./REHAB.OF FLD MITIGAT'N FACILITIES W/N MAJ.RVR BASINS&PRIN.RIVERS-CONST.OF FLD MITIGAT'N STRUC-CONST.OF RIVR CONST.OF FLD MITIGAT'N STRUC-CONST.OF RIVR CONTL/RIVR PROT.,CAROAN,GONZAGA,CAG. | Cagayan 1st DEO | ₱38.0M | Reported complete | TJMT CONST | 296 | Check in |
| Construction of Guardwall along Uyugan-Mahatao Interior Rd, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱37.6M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 110 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM; CONSTRUCTION OF GUARDWALL ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN RD, SABTANG, BATANES | Batanes DEO | ₱35.3M | 92% reported progress | J F GABOTERO INC | 124 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM; CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF GUARDWALL ALONG MAYAN-MAUYEN PORT ROAD, ITBAYAT, BATANES | Batanes DEO | ₱35.2M | 95% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 97 | Check in |
| Construction of Uyugan Seawall, Brgy. Kayuganan Uyugan, Batanes | BATANES | ₱31.2M | Reported complete | ST TIMOTHY CONST CORP | 115 | Check in |
| CONSTRUCTION OF IVANA SEAWALL, IVANA, BATANES | Batanes DEO | ₱29.6M | Reported complete | A P B CONST | 115 | Check in |
| Construction of Bank Protection along Wangag River (Upper Stream) Pateng Bridge along DSVR Pateng, Gonzaga, Cagayan, Phase I | GONZAGA (CAGAYAN), CAGAYAN | ₱29.4M | Reported complete | APS CONST | 292 | Check in |
| Construction of Bank Protection along Wangag River (Upper Stream) Pateng Bridge along DSVR Pateng, Gonzaga, Cagayan, Package 2 | GONZAGA (CAGAYAN), CAGAYAN | ₱29.4M | Reported complete | APS CONST | 292 | Check in |
| Construction of Guardwall along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd (S00016BN) - K0005 + 010 - K0005 + 090, K0015 + 452 - K0015 + 783, Ivana, Batanes | IVANA (BATANES), BATANES | ₱29.4M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 109 | Check in |
| Construction of Guardwall along Uyugan-Mahatao Interior (S00017BN), K0032 + 088 - K0032 + 119, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱29.3M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 110 | Check in |
| Construction of Guardwall along Uyugan-Mahatao Interior (S00017BN) - K0029 + 501 - K0029 + 626, K0029 + 792 - K0029 + 850, K0029 + 935 - K0030 + 095, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱28.8M | Reported complete | J I ESPINO CONST | 111 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVER CONTROL, BRGY. CASITAN, GONZAGA, CAGAYAN | Cagayan 1st DEO | ₱28.8M | Reported complete | APS CONST | 295 | Check in |
| Construction (Completion) of Basco Seawall and Fishing Boat Shelter Basco, Barangay San Antonio, Basco, Batanes | BATANES | ₱27.2M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 106 | Check in |
| Rehabilitation of San Antonio Flood Control, Brgy. San Antonio Basco, Batanes | BATANES | ₱24.9M | Reported complete | ST TIMOTHY CONST CORP | 106 | Check in |
| Construction of Guardwall (along Basco-Mahatao-Ivana-Uyugan-Imnajbu Road), Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱24.1M | Reported complete | J F GABOTERO INC | 116 | Check in |
| IMPROVEMENT OF IVANA SEAWALL AND BOAT SHELTER PORT | Batanes DEO | ₱23.3M | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 116 | Check in |
| CONSTRUCTION OF GUARD WALL ALONG SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD | Batanes DEO | ₱23.3M | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 122 | Check in |
| CONSTRUCTION OF GUARDWALL ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD (S000016BN)-K0006+510-K0006+536.00, K0008+624.00-K0008+754.00, K0008+817.40-K0008+854.00, K0008+875.6-K0008+946.50, K0016+340.00-K0016+380.00, K0016+840.00-K0017+573.30, K0024+770 | Batanes DEO | ₱22.4M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 111 | Check in |
| CONSTRUCTION OF SEAWALL ALONG SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD (S00003ST),STA. 17+53.00-STA. 17+358.00, BRGY. NAKANMUAN, SABTANG, BATANES | Batanes DEO | ₱22.3M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 125 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINTS MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SEAWALL BARANGAY CAROAN, GONZAGA, CAGAYAN | Cagayan 1st DEO | ₱21.7M | Reported complete | APS CONST | 296 | Check in |
| Construction of Nakanmuan Seawall, Barangay Nakanmuan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱21.2M | Reported complete | J F GABOTERO INC | 122 | Check in |
| CONSTRUCTION OF SAN VICENTE SABTANG SEAWALL AND SHORE PROTECTION WALL (PACKAGE 1) | Batanes DEO | ₱20.2M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 122 | Check in |
| CONSTRUCTION OF PALAWIG RIVER CONTROL PROJECT STA. ANA, CAGAYAN | Cagayan 1st DEO | ₱20.1M | Reported complete | A P B CONST | 264 | Check in |
| CONSTRUCTION OF CASAMBALANGAN RIVER CONTROL PROJECT CASAMBALANGAN, STA. ANA, CAGAYAN | Cagayan 1st DEO | ₱20.0M | Reported complete | A P B CONST | 272 | Check in |
| Construction of Seawall, Brgy. Santa Maria, Buguey, Cagayan | BUGUEY (CAGAYAN), CAGAYAN | ₱19.8M | Reported complete | REYROSE CONST | 299 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF SONGSONG FLOOD CONTROL STRUCTURE,BARANGAY KAYVALUGANAN,UYUGAN, BATANES | Batanes DEO | ₱19.6M | 96% reported progress | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 114 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST: MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DICHOD SECTION, BARANGAY KAYUGANAN, UYUGAN, BATANES | Batanes DEO | ₱19.6M | 81% reported progress | J F GABOTERO INC | 115 | Check in |
| ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS:FLOOD MANAGEMENT PROGRAM:CONTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF SHORE PROTECTION STRUCTURES ALONG BASCO-ITBUD DIVERSION ROAD | Batanes DEO | ₱19.6M | 80% reported progress | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 112 | Check in |
| IMPROVEMENT OF IVANA FLOOD CONTROL/SEAWALL, IVANA, BATANES | Batanes DEO | ₱19.6M | Reported complete | E M CUERPO INC | 116 | Check in |
| CONSTRUCTION (COMPLETION) OF BASCO SEAWALL AND FISHING BOAT SHELTER | Batanes DEO | ₱19.3M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 106 | Check in |
| Rehabilitation of Seawall at the Crab Hotel, Centro, Buguey, Cagayan | BUGUEY (CAGAYAN), CAGAYAN | ₱19.0M | Reported complete | RPF CONST | 299 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM:CONST./MAINT.OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONST.OF SHORE PROTECTION STRUCTURE ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD,KADPIDAN SECTION,IVANA,BATANES | Batanes DEO | ₱17.9M | 13% reported progress | DEKM CONST | 115 | Check in |
| CONSTRUCTION OF SAN VICENTE SABTANG SEAWALL AND SHORE PROTECTION WALL (PACKAGE 2), SABTANG, BATANES | Batanes DEO | ₱17.3M | Reported complete | HGW=3 ENGINEERING | 122 | Check in |
| Construction of Seawall (Busbusan), Barangay Hañib, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱16.4M | Reported complete | STRONGLANE BUILDERS AND TRADING CORP FORMERLY: STRONGLANE CONST & TRADING | 110 | Check in |
| CONSTRUCTION/REHABILITATION OF MAHATAO FLOOD CONTROL STA.0+000-STA.0+146, MAHATAO, BATANES | Batanes DEO | ₱15.8M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 110 | Check in |
| CONSTRUCTION OF GUARD WALL ALONG BASCO - MAHATAO - IVANA - UYUGAN - IMNAJBU ROAD AND UYUGAN - MAHATAO INTERIOR ROAD, BATAN ISLAND | Batanes DEO | ₱15.7M | Reported complete | WERR CORP INTERNATIONAL | 111 | Check in |
| LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM- CONSTRUCTION OF SEA WALL ALONG THE SHORES OF BARANGAY MINANGA, GONZAGA, CAGAYAN | Cagayan 1st DEO | ₱14.8M | Reported complete | APS CONST | 290 | Check in |
| RECONSTRUCTION OF CHAJAJAS FLOOD CONTROL, BRGY. CHANARIAN, BASCO, BATANES | Batanes DEO | ₱14.7M | Reported complete | R L PACANA'S CONST | 108 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE I, BARANGAY SUMNANGA, SABTANG, BATANES | Batanes DEO | ₱13.9M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 126 | Check in |
| BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES: CONSTRUCTION OF SEAWALL (PHASE I), BUSBUSAN CREEK TO LALAG CREEK, BARANGAY ITBUD, UYUGAN, BATANES | Batanes DEO | ₱9.9M | 90% reported progress | SWIFT DEVELOPMENT AND SUPPLIES CORP | 112 | Check in |
| Construction of Yasyas Flood Control (Phase II), Barangay Kaychanarianan, Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱9.8M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 106 | Check in |
| Construction of Uyugan Flood Control (Valugan Section) Phase 2, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 115 | Check in |
| Construction of Barangay Kayuganan Seawall, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 115 | Check in |
| Construction of Sumnanga Seawall, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 126 | Check in |
| CONSTRUCTION OF VAHANGSIEN-YAS YAS DRAINAGE SYSTEM (COVERED CANAL), BRGY. KAYHUVOKAN, BASCO, BATANES | Batanes DEO | ₱9.8M | Reported complete | R L PACANA'S CONST | 106 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION OF CHAHAMPUAY FLOOD CONTROL STRUCTURE, BARANGAY SAVIDUG, SABTANG, BATANES | Batanes DEO | ₱9.8M | 32% reported progress | HGW=3 ENGINEERING | 123 | Check in |
| Construction of Guardwall along Sn Vicente-Savidug-Chavayan-Sumananga-Nakanmuan Rd, K0018 + 000 - K0018 + 029, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 124 | Check in |
| Construction of Itbud Seawall, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.7M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 112 | Check in |
| Construction of Uyugan Flood Control (Valugan Section), Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.7M | Reported complete | REMAR CONST | 115 | Check in |
| Construction of Songsong Flood Control, Kayvaluganan, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.7M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 114 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGAY KAYVALUGANAN SEAWALL, UYUGAN, BATANES | Batanes DEO | ₱9.4M | Reported complete | REMAR CONST | 115 | Check in |
| Construction of Flood Control Savang-Aksung, Barangay Nakanmuan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱8.3M | Reported complete | CVAP CONST | 125 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF RETAINING WALL AT RADIWAN PORT, BARANGAY RADIWAN, IVANA, BATANES | Batanes DEO | ₱7.8M | 94% reported progress | DEKM CONST | 116 | Check in |
| Construction of Chariz Seawall (Phase II), Barangay Nakanmuan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱7.4M | Reported complete | JERIS CONST AND SUPPLY | 125 | Check in |
| Rehabilitation of Katuvang Seawall, Barangay Sumnanga, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱6.0M | Reported complete | CVAP CONST | 116 | Check in |
| Construction of Retaining Wall and Road Concreting of Diajan, Barangay San Antonio, Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱5.9M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 106 | Check in |
| Construction of Flood Control (Shoreline Protection) at Sitio Diptan, Barangay Sinakan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱5.0M | Reported complete | BHM CONST | 122 | Check in |
| Construction of Flood Control (Sewerage Net/Screen) along Rayasan Bridge, Barangay Kaychanarianan, Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱4.9M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 106 | Check in |
| Construction of Slope Protection wall along Mission River in Barangay Cabanban Sur, Gonzaga, Cagayan | GONZAGA (CAGAYAN), CAGAYAN | ₱4.9M | Reported complete | APS CONST | 296 | Check in |
| Construction of a Seawall, Buguey, Cagayan | BUGUEY (CAGAYAN), CAGAYAN | ₱4.9M | Reported complete | RPF CONST | 299 | Check in |
| Construction of Retaining Wall, Sitio Ratay, Brgy. Itbud, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱4.9M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 112 | Check in |
| Construction of Diura Seawall, Sitio Diura, Barangay Uvoy, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱4.9M | Reported complete | DEKM CONST | 110 | Check in |
| Construction of Retaining Wall (Along Clemente Laurel Residence), Barangay Uvoy, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱4.9M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 110 | Check in |
| Construction of Retaining Wall at Joon St., Barangay Kaumbakan, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱4.9M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 110 | Check in |
| Construction of Flood Control along Upper Creek at Sitio Lalag, Barangay Itbud, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱4.9M | Reported complete | REMAR CONST | 112 | Check in |
| CONSTRUCTION OF RETAINING WALL IN BRGY. STA ROSA (SITIO PIAVUYUGAN ALONG FMR RASAYAN TO KARAXPESAN), BRGY. STA. ROSA, ITBAYAT, BATANES | Batanes DEO | ₱4.9M | Reported complete | SWIFT DEVELOPMENT AND SUPPLIES CORP | 95 | Check in |
| Construction of Sayed Flood Control, Barangay Salagao, Ivana, Batanes | IVANA (BATANES), BATANES | ₱4.8M | Reported complete | REMAR CONST | 115 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL (STA. MARIA-CHALAN-ANAN) AT BRGY. KAYVALUGANAN, BASCO, BATANES | Batanes DEO | ₱4.7M | Reported complete | R L PACANA'S CONST | 105 | Check in |
| CONSTRUCTION OF RETAINING WALL (WITH BOX CULVERT), BRGY. SINAKAN, SABTANG, BATANES | Batanes DEO | ₱4.2M | Reported complete | ST TIMOTHY CONST CORP | 122 | Check in |
| Construction of Retaining Wall (Hillside) along Cabugao Road at Barangay Kayuganan, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱4.1M | Reported complete | SWIFT DEVELOPMENT AND SUPPLIES CORP | 115 | Check in |
| CONSTRUCTION OF SEAWALL, BRGY. UVOY, MAHATAO, BATANES | Batanes DEO | ₱3.9M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 110 | Check in |
| REPAIR/MAINTENANCE OF DAMAGED REVETMENT OF CENTRO RIVER CONTROL, CENTRO, STA. ANA, CAGAYAN | Cagayan 1st DEO | ₱3.9M | Reported complete | APS CONST | 264 | Check in |
| REHABILITATION OF LALAG BOX CULVERT ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD-K0023+333 | Batanes DEO | ₱3.1M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 112 | Check in |
| CONSTRUCTION OF MAHATAO FLOOD CONTROL, BRGY. UVOY, MAHATAO, BATANES | Batanes DEO | ₱2.9M | Reported complete | RED MOLE CONST | 110 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL, BRGY. KAYCHANARIANAN, BASCO, BATANES | Batanes DEO | ₱2.9M | Reported complete | J I ESPINO CONST | 106 | Check in |
| Construction of Uyugan Flood Control (Dichod Section), Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱2.9M | Reported complete | REMAR CONST | 115 | Check in |
| REHABILITATION OF RETAINING WALL, BRGY. SAN ANTONIO, BASCO, BATANES | Batanes DEO | ₱2.9M | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 106 | Check in |
| CONSTRUCTION OF YAS-YAS CREEK WALL, BRGY. KAYCHANARIANAN, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 106 | Check in |
| CONSTRUCTION OF PADANGAN FLOOD CONTROL STRUCTURE, BRGY. KAYCHANARIAN, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 106 | Check in |
| CONST'N OF MOTCHONG PARK RETAINING WALL, UYUGAN, BATANES | Batanes DEO | ₱2.0M | Reported complete | L M CANLAS CONST | 114 | Check in |
| CONSTRUCTION OF DRAINAGE CANAL AT SITIO CHAVUAN, BRGY. SAN ANTONIO, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 106 | Check in |
| CONSTRUCTION OF DRAINAGE CANAL AT YAS-YAS I, BRGY. KAYCHANARIANAN, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 106 | Check in |
| CONSTRUCTION OF CABUGAO FLOOD CONTROL, BRGY. POBLACION, UYUGAN, BATANES | Batanes DEO | ₱1.9M | Reported complete | R L PACANA'S CONST | 115 | Check in |
| CONSTRUCTION OF DRAINAGE SYSTEM, SITIO CHAVUAN,SAN ANTONIO, BASCO, BA | Batanes DEO | ₱1.9M | Reported complete | R L PACANA'S CONST | 106 | Check in |
| CONSTRUCTION OF LAVAK RETAINING WALL, BRGY. SINAKAN, SABTANG, BATANES | Batanes DEO | ₱1.5M | Reported complete | R L PACANA'S CONST | 122 | Check in |
| REHABILITATION OF BOX CULVERT, SITIO PIAVUYUGAN, BRGY. STA ROSA, ITBAYAT, BATANES | Batanes DEO | ₱986,993 | Reported complete | L M CANLAS CONST | 95 | Check in |
| CONSTRUCTION OF RETAINING WALL(BARSANA SOUTHWARD), RADIWAN, IVANA, BATANES | Batanes DEO | ₱947,332 | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 116 | Check in |