Barangay
Lambakin
Lambakin, San Miguel, Bulacan, Region III (Central Luzon). Rural. Population 3,319 (2024 POPCEN).
PSGC 0301421025 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Lambakin
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
25 records · ₱1,685,415,339.80
- Convergence and Special Support Program-Basic Infras. Prog.-Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities-Construction of Flood Control Structure Along Bulo River(Upstream),Phase Ii,Barangay Bardias,San Miguel,Bulacan₱98,999,322.46 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Convergence and Special Support Program-Basic Infras. Prog.-Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities-Construction of Flood Control Structure Along Bulo River (Upstream),Phase 13,Barangay Bardias,San Miguel,Bulacan₱97,533,195.88 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structures Along Bulo River Sta. 25+090 - Sta. 25+980, San Miguel Bulacan₱96,495,644.65 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of River Slope Protection Structure Along Maasim River (Segment A), Purok 4, Barangay Lambakin, San Miguel, Bulacan₱95,138,839.80 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Sustainable Infras. Projects Alleviating Gaps (Sipag) - Sipag - Flood Mitigation Structures Protecting Public Infrastructures/Facilities - Const. of River Slope Protection Structure Along Bulo River (Segment E), Purok 6, Brgy. Lambakin, San Miguel,Bulacan₱95,102,510.60 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of River Slope Protection Structure Along Maasim River (Segment B), Purok 4, Barangay Lambakin, San Miguel, Bulacan₱95,100,487.52 · 2025 · medium confidence (project coordinates inside the barangay boundary)
How linked: 25 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Lambakin itself. This shows the municipality figure for San Miguel.
5 records · ₱60,427,919.73
1 placed at San Miguel level itself; the rest in LGUs under it.
- Municipality of San Miguel, Bulacan₱53,926,919.73 · high confidence (the LGU itself is the buyer)
- Barangay San Juan - San Miguel, Bulacan₱2,174,000.00 · high confidence (the LGU itself is the buyer)
- Barangay Bagong Pag-Asa - San Miguel, Bulacan₱1,496,000.00 · high confidence (the LGU itself is the buyer)
- Barangay Cambio - San Miguel, Bulacan₱1,432,000.00 · high confidence (the LGU itself is the buyer)
- Barangay Labne - San Miguel, Bulacan₱1,399,000.00 · high confidence (the LGU itself is the buyer)
How linked: 5 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Lambakin itself. This shows the province figure for Bulacan.
33,321 records · ₱249,214,437,722.44
33,270 placed at Bulacan level itself; the rest in LGUs under it.
- Bulacan₱249,214,437,722.44 · 33,270 awards · high confidence (area of delivery is this province only)
- Aurora, Bataan, Bulacan, Nueva Ecija, Pampanga, Tarlac, Zambales₱315,284,183.51 · 23 awards · low confidence (area of delivery lists several provinces)
- Bohol, Bukidnon, Bulacan, Cagayan₱26,967,830.69 · 1 awards · low confidence (area of delivery lists several provinces)
- Aurora, Bulacan, Nueva Ecija, Pampanga₱23,640,153.00 · 5 awards · low confidence (area of delivery lists several provinces)
- Bulacan, Cagayan₱12,244,267.53 · 2 awards · low confidence (area of delivery lists several provinces)
- Bataan, Batanes, Batangas, Benguet, Biliran, Bohol, Bukidnon, Bulacan, Cagayan, Camarines Norte₱8,259,635.30 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 33,270 by area of delivery is this province only; 51 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Lambakin itself. This shows the municipality figure for San Miguel.
10 records · ₱54,500,000.00
2 placed at San Miguel level itself; the rest in LGUs under it.
- Concreting of Farm-to-Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱7,500,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱6,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Local Road in Barangay Buliran, San Miguel₱5,000,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 10 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
15 records · ₱983,000,000.00
- Construction of River Slope Protection Structure Along Bulo River (Segment A), Purok 6, Barangay Lambakin, San Miguel, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of River Slope Protection Structure Along Bulo River (Segment B), Purok 6, Barangay Lambakin, San Miguel, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of River Slope Protection Structure Along Bulo River (Segment C), Purok 6, Barangay Lambakin, San Miguel, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of River Slope Protection Structure Along Bulo River (Segment D), Purok 6, Barangay Lambakin, San Miguel, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of River Slope Protection Structure Along Bulo River (Segment E), Purok 6, Barangay Lambakin, San Miguel, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of River Slope Protection Structure Along Maasim River (Segment A), Purok 4, Barangay Lambakin, San Miguel, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
How linked: 15 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- High Concurrent Workload for One ContractorSto Cristo Const & Trading Inc for: Sto Cristo Const & TradingContractor: Sto Cristo Const & Trading Inc for: Sto Cristo Const & Trading
- High Concurrent Workload for One ContractorL R Tiqui Builders IncContractor: L R Tiqui Builders Inc
- High Concurrent Workload for One Contractor11-16 ConstContractor: 11-16 Const
- Contractor Concentration (Flood Control)Sto Cristo Const & Trading Inc for: Sto Cristo Const & TradingContractor: Sto Cristo Const & Trading Inc for: Sto Cristo Const & Trading
- Low-Graded DPWH Contractor Winning DepEd/DOH WorksE M Cuerpo IncContractor: E M Cuerpo Inc
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 12 contractors on DPWH projects linked to Lambakin and the LGUs under it. Click a column to sort.
| 11-16 Const | 9 | ₱855,779,192.63 | 1 |
| Flordes Const | 3 | ₱291,603,185.88 | 0 |
| L R Tiqui Builders INC | 3 | ₱144,013,812.77 | 1 |
| Jagonbuild Const CORP For Jagon Builders | 1 | ₱96,495,644.65 | 0 |
| E M Cuerpo INC | 1 | ₱91,529,804.72 | 1 |
| Sto Cristo Const & Trading INC For: Sto Cristo Const & Trading | 1 | ₱64,847,873.01 | 2 |
| Sto Cristo Const | 1 | ₱47,798,062.67 | 0 |
| Orani Const And Supply CORP Formerly:Orani Builders | 1 | ₱43,424,748.22 | 0 |
| Alpha | 1 | ₱37,435,948.77 | 0 |
| Jemn Builders | 2 | ₱5,642,552.63 | 0 |
| Montadel Ent | 1 | ₱4,947,681.67 | 0 |
| Santiago-Galvan Const | 1 | ₱1,896,832.18 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in Bulacan
BIR publishes collections by province and city, not by town or barangay. Lambakin is in Bulacan.
₱14.87 billion
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Lambakin
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
