Municipality
Sampaloc
Sampaloc, Quezon, Region IV-A (CALABARZON). 4th income class. Population 13,331 (2024 POPCEN).
Data-quality note: 1 DPWH project linked to Sampaloc has no coordinates published by DPWH, so it is not on the map and cannot be checked with satellite images.
PSGC 0405639000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Sampaloc
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
59 records · ₱962,240,288.94
2 placed at Sampaloc level itself; the rest in LGUs under it.
- Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0141 + 530 - K0144 + 000...K0148 + 677 - K0149 + 000₱144,747,438.74 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Cssp - Special Road Fund - Mvuc As Per R.A. 11239 - Installation of Road Safety Devices Along Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd (S01555lz) K0134+000 - K0134+155 (R/S) ... K0143+450 - K0143+480 (R/S)₱97,971,243.94 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0144 + 000 - K0145 + 000, K0145 + 490 - K0148 + 677₱96,499,979.49 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Lucena - Tayabas - Lucban - Sampaloc - Mauban Port Rd -K0149 + 326 - K0153 + 332, Sampaloc, Quezon₱96,499,829.62 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Lucena - Tayabas - Lucban - Sampaloc - Mauban Port Rd - K0135 + 000 - K0140 + 019, K0140 + 039 - K0141 + 350₱96,493,585.58 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Construction of By-Pass and Diversion Roads - Sampaloc Bypass Road, Sampaloc, Quezon₱68,594,623.19 · 2024 · medium confidence (project coordinates inside the barangay boundary)
How linked: 57 by project coordinates inside the barangay boundary; 1 by project title names the place; 1 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
5 records · ₱361,377,701.43
1 placed at Sampaloc level itself; the rest in LGUs under it.
- Municipality of Sampaloc, Quezon₱356,453,908.69 · high confidence (the LGU itself is the buyer)
- Barangay Bayongon, Sampaloc, Quezon₱2,057,479.09 · high confidence (the LGU itself is the buyer)
- Barangay Ilayang Owain, Sampaloc, Quezon₱1,167,288.00 · high confidence (the LGU itself is the buyer)
- Barangay Caldong - Sampaloc, Quezon₱1,124,995.42 · high confidence (the LGU itself is the buyer)
- Barangay Apasan - Sampaloc,Quezon₱574,030.23 · high confidence (the LGU itself is the buyer)
How linked: 5 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Sampaloc itself. This shows the province figure for Quezon.
99,390 records · ₱247,400,548,298.55
99,327 placed at Quezon level itself; the rest in LGUs under it.
- Quezon₱247,400,548,298.55 · 99,327 awards · high confidence (area of delivery is this province only)
- Cavite, Laguna, Quezon₱30,560,594.28 · 21 awards · low confidence (area of delivery lists several provinces)
- Batangas, Cavite, Laguna, Quezon₱28,786,064.50 · 3 awards · low confidence (area of delivery lists several provinces)
- Batangas, Cavite, Laguna, Quezon, Rizal₱26,970,394.00 · 11 awards · low confidence (area of delivery lists several provinces)
- Batangas, Quezon₱23,060,054.72 · 7 awards · low confidence (area of delivery lists several provinces)
- Batangas, Cavite, Laguna, Marinduque, Oriental Mindoro, Quezon, Rizal, Romblon₱16,791,920.00 · 2 awards · low confidence (area of delivery lists several provinces)
How linked: 99,327 by area of delivery is this province only; 63 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
2 records · ₱32,780,000.00
- Lgsf_gef₱30,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Lgsf_gef₱2,780,000.00 · 2025 · high confidence (location columns in the DBM release)
How linked: 2 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
48 records · ₱339,283,000.00
16 placed at Sampaloc level itself; the rest in LGUs under it.
- Construction of By - Pass and Diversion Roads - Sampaloc Bypass Road, Sampaloc, Quezon ( Package C )₱70,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Maapon River Flood Control, Sampaloc, Quezon₱41,000,000.00 · 2020 · high confidence (GAA line text names the place)
- Construction of Maapon River Flood Control, Sampaloc, Quezon₱33,303,000.00 · 2021 · high confidence (GAA line text names the place)
- Construction/Rehabilitation of Old Municipal Building, Sampaloc, Quezon₱20,000,000.00 · 2019 · high confidence (GAA line text names the place)
- Construction of Maapon River Flood Control Project, Brgys. San Isidro-Ibabang Owain, Sampaloc, Quezon₱15,000,000.00 · 2017 · high confidence (GAA line text names the place)
- Concreting of Brgy. Bataan Fmr, Brgy. Bataan, Sampaloc, Quezon₱12,000,000.00 · 2023 · high confidence (GAA line text names the place)
How linked: 48 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)I&E Const Corp Formerly: I&E ConstrContractor: I&E Const Corp Formerly: I&E Constr
- High Concurrent Workload for One ContractorMg Samidan ConstContractor: Mg Samidan Const
Contractors on linked DPWH projects
All 24 contractors on DPWH projects linked to Sampaloc and the LGUs under it. Click a column to sort.
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in Sampaloc (14)
- Alupay · 1 DPWH projects
- Apasan · 3 DPWH projects
- Banot · 12 DPWH projects
- Bataan · 6 DPWH projects
- Bayongon · 1 DPWH projects
- Bilucao · 4 DPWH projects
- Caldong · 4 DPWH projects
- Ibabang Owain
- Ilayang Owain · 14 DPWH projects
- Mamala · 1 DPWH projects
- San Bueno · 4 DPWH projects
- San Isidro · 2 DPWH projects
- San Roque · 5 DPWH projects
- Taquico
QR codes for Sampaloc
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
