Barangay

Geronimo

Geronimo, Rodriguez, Rizal, Region IV-A (CALABARZON). Urban. Population 6,829 (2024 POPCEN).

PSGC 0405808003 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Geronimo

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

Not yet linked to Geronimo itself. This shows the municipality figure for Rodriguez.

237 records · ₱6,850,938,804.10

51 placed at Rodriguez level itself; the rest in LGUs under it.

  1. Construction of Parawagan Road Including Drainage Systems and Slope Protection Structures at Brgy San Rafael, Montalban, Rizal (Package 2)₱292,545,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  2. Construction of Flood Control and Bank Protection Structureslukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2₱192,977,502.40 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  3. Construction of Flood Control and Slope Protection Structures Along Lukutang Malaki River, Barangay San Isidro, Rodriguez, Rizal Package 3₱192,194,528.03 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  4. Construction of Flood Mitigation Structure at Upper Marikina River From Brgy. San Jose Going to Brgy. Balite (Phase 1), Rodriguez, Rizal₱190,251,635.59 · 2022 · medium confidence (project coordinates inside the barangay boundary)
  5. Construction of Flood Control Andbank Protection Structures Alonglukutang Malaki River, Barangay Sanisidro, Rodriguez, Rizal - Package 1₱190,087,587.26 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  6. Construction of Flood Mitigation Structure at Upper Marikina River From Brgy. San Jose Going to Brgy. Balite (Phase 2), Rodriquez, Rizal₱144,214,815.13 · 2023 · medium confidence (project coordinates inside the barangay boundary)

How linked: 186 by project coordinates inside the barangay boundary; 45 by project title names the place; 6 by project coordinates inside the city/municipality boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Geronimo itself. This shows the municipality figure for Rodriguez.

4 records · ₱471,245,877.55

1 placed at Rodriguez level itself; the rest in LGUs under it.

  1. Municipality of Rodriguez, Rizal₱469,350,883.67 · high confidence (the LGU itself is the buyer)
  2. Barangay Manggahan - Rodriguez, Rizal₱1,099,543.88 · high confidence (the LGU itself is the buyer)
  3. Barangay Rosario - Rodriguez, Rizal₱428,570.00 · high confidence (the LGU itself is the buyer)
  4. Barangay Balite - Rodriguez, Rizal₱366,880.00 · high confidence (the LGU itself is the buyer)

How linked: 4 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Geronimo itself. This shows the province figure for Rizal.

70,850 records · ₱157,337,540,777.27

70,828 placed at Rizal level itself; the rest in LGUs under it.

  1. Rizal₱157,337,540,777.27 · 70,828 awards · high confidence (area of delivery is this province only)
  2. Batangas, Cavite, Laguna, Quezon, Rizal₱26,970,394.00 · 11 awards · low confidence (area of delivery lists several provinces)
  3. Batangas, Cavite, Laguna, Marinduque, Oriental Mindoro, Quezon, Rizal, Romblon₱16,791,920.00 · 2 awards · low confidence (area of delivery lists several provinces)
  4. Quezon, Quirino, Rizal₱6,851,825.13 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Laguna, Quezon, Rizal₱2,747,549.90 · 2 awards · low confidence (area of delivery lists several provinces)
  6. Quirino, Rizal₱467,415.00 · 2 awards · low confidence (area of delivery lists several provinces)

How linked: 70,828 by area of delivery is this province only; 22 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Geronimo itself. This shows the municipality figure for Rodriguez.

4 records · ₱25,606,882.17

1 placed at Rodriguez level itself; the rest in LGUs under it.

  1. Electrification of Barangay Mascap₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Proposed Installation of Led Solar Streetlights Along Parawagan Road, Barangay San Rafael, Rodriguez, Rizal₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
  3. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  4. Construction of Health Center at Brgy. San Isidro₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)

How linked: 4 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

Not yet linked to Geronimo itself. This shows the municipality figure for Rodriguez.

150 records · ₱3,805,488,000.00

43 placed at Rodriguez level itself; the rest in LGUs under it.

  1. Construction of Flood Mitigation Structure at Upper Marikina River From Brgy. San Jose Going to Brgy. Balite (Phase 1), Rodriguez, Rizal₱200,000,000.00 · 2022 · high confidence (GAA line text names the place)
  2. Construction of Flood Mitigation Structure at Upper Marikina River From Brgy. San Jose Going to Brgy. Balite (Phase 2), Rodriguez, Rizal₱150,000,000.00 · 2023 · high confidence (GAA line text names the place)
  3. Construction of Flood Control and Bank Protection Structure Along Lukutang Malaki River, Rodriguez (Montalban), Rizal₱100,000,000.00 · 2023 · high confidence (GAA line text names the place)
  4. Construction of Flood Control Structure Along Puray River, Brgy. San Jose and Brgy, San Isidro, Rodriguez, Rizal₱100,000,000.00 · 2022 · high confidence (GAA line text names the place)
  5. Construction of Flood Control Structure Along Upper Marikina River (Phase Iii, R/S), Brgy. San Jose, Rodriguez, Rizal₱100,000,000.00 · 2022 · medium confidence (GAA line text names the place)
  6. Construction of Flood Control Structure Along Upper Marikina River (Phase Iv, R/S), Brgy. San Jose, Rodriguez, Rizal₱100,000,000.00 · 2022 · medium confidence (GAA line text names the place)

How linked: 150 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Geronimo itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Rodriguez.

See all 16 published flags in Rodriguez

Contractors on linked DPWH projects

None linked to Geronimo itself; showing Rodriguez.

Taxes collected by the BIR in Rizal

BIR publishes collections by province and city, not by town or barangay. Geronimo is in Rizal.

₱7.25 billion

Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug

Coverage differs from the LGU boundary. BIR note: “Includes collections from the municipalities of Angono, Baras, Binangonan, Cainta, Cardona, Jala-Jala, Morong, Pililla, Tanay and Taytay in Rizal”

These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities

Share card: Geronimo

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Geronimo

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG