News · Data
Ombudsman says 79 flood-control cases are now in court. Here is what the DPWH contract records show
On November 6 the Ombudsman reported 79 flood-control-related cases filed in courts, covering about ₱10.78 billion in project value. We put those aggregates next to the flood-control contracts, schedule patterns and published indicators already on this site — without naming anyone accused.
By Love the Philippines Data Desk
Published · 9 min read · Data as of November 7, 2026

The Office of the Ombudsman announced on November 6, 2026 that 79 cases related to flood-control projects have been filed in Philippine courts — 75 at the Sandiganbayan and four in local courts — covering about ₱10.78 billion in project value, according to GMA News and the Philippine Daily Inquirer.
Those filings are the Ombudsman's work, as reported by those newsrooms. This site does not prosecute anyone and does not decide guilt. What it does hold is a public mirror of DPWH contract records: titles, costs, status labels, dates, progress figures, regions and, after human review, rule-based indicators that mark patterns worth a closer look. Below we put the November 6 aggregates next to that universe of flood-control contracts so a citizen can inspect the same kind of records the headlines are about — without treating a filed case, or a published indicator, as proof against any named person.
We do not name any person the Ombudsman identified as a respondent. Role counts from the news reports are shown as counts only. Single-record amounts of ₱10 billion or more on this site stay held for verification under our standards; the ₱10.78 billion figure below is a news-attributed Ombudsman aggregate, not a single contract row.
For the broader flood-control landscape on this site, see Flood control by the numbers. Yesterday we matched COA's delay and defect findings to the same contract file in COA's delayed and defective DPWH projects. Today's piece is the Ombudsman filing hook, not a rehash of either.
What the Ombudsman reported (via news)
According to GMA News and the Inquirer, summarizing Ombudsman Jesus Crispin Remulla's November 6 press conference:
| Item (as reported Nov. 6, 2026) | Figure |
|---|---|
| Flood-control-related cases filed in courts | 79 |
| Filed at Sandiganbayan | 75 |
| Filed in local courts | 4 |
| Case mix (as stated by the Ombudsman) | 2 plunder · 22 malversation of public funds · 55 Republic Act 3019 |
| Project value covered by flood-control cases pending in court | about ₱10.78 billion |
| Persons named as accused in those 79 cases (count only) | 67 |
| Role mix among the 67 (counts only; no names) | 1 senator · 1 former senator · 4 members of the House · 1 former member of the House · 1 former DPWH secretary · 39 DPWH personnel · 9 contractors · 2 congressional staff · 9 private individuals |
| Separate non-flood-control cases filed | 57 cases · 138 respondents · about ₱13 billion in public funds (as reported) |
| Flood-control cases still under preliminary investigation (Inquirer) | 25, including four additional House members "pending filing" |
GMA quoted the Ombudsman saying the ₱10.78 billion is "the amount of projects involved in cases pending before the court now," and that a larger universe exists but prosecutors are "working with the evidence that we have so far." The Inquirer quoted him: "So far, meron kami ebidensya sa 10.78 billion na covered ng kaso."
Republic Act 3019 is the statute the Ombudsman cited for 55 of the filings. We use the Act's number here; for the official short title, see the news reports linked in Sources.
None of the rows above is a finding by this site. They are what those newsrooms attributed to the Ombudsman on November 6. Courts will decide the cases. Innocent explanations and defenses remain available to every respondent.
Scale of flood-control contracts in our database
This database holds 248,550 DPWH project records (one row per contract or component after de-duplication) with a recorded cost of about ₱6,378.53 billion. Filtering to records whose published category contains "flood" — the DPWH "Flood Control and Drainage" family and related flood-structure labels — leaves 24,426 contracts worth about ₱1,056.51 billion.
| Recorded status (flood-category contracts) | Projects | Recorded value (₱B) |
|---|---|---|
| Completed | 17,883 | 628.14 |
| On-Going | 5,439 | 419.59 |
| For Procurement | 877 | 0.00 |
| Terminated | 131 | 1.93 |
| Not Yet Started | 96 | 6.86 |
Most flood-category value is marked completed. The open book — on-going, not-yet-started and for-procurement rows — is where a citizen following court filings can still watch status, dates and progress change in public. Browse the search database, the map and the indicators pages; methodology is on /methodology.
The Ombudsman's ₱10.78 billion is a cases-covered aggregate from the press conference. It is not the same as our ₱1,056.51 billion flood-category total, and it is not a claim that every flood-control contract is under investigation. The useful comparison for a reader is scale and access: the public file is large, searchable and already flagged where our rules fire.
Status and schedule patterns citizens can check
Of the 5,439 flood-category contracts labelled On-Going, 5,438 (about ₱419.22 billion) already have a target_end_date earlier than today. The median such contract is roughly 461 days past its recorded target. Only one on-going flood-category row still shows a future target date in this refresh.
That pattern has more than one possible reading:
- work may be delayed, suspended or idle; or
- target dates in the public feed may not be updated when schedules slip, so the field is stale even when work continues.
Both can be true in different offices. The public record alone cannot tell them apart. What it can show is how often the dates disagree with the status label — the same family of delivery questions we raised against COA's 2025 audit coverage yesterday.
A sharper inconsistency: 1,081 flood-category on-going contracts (₱65.72 billion) already show progress_pct = 100 but are still labelled On-Going. A project that is 100% complete on paper and still "on-going" in status is exactly the kind of record a reader would want explained — by an office, an auditor or, where a case exists, by the parties in court. It is not, by itself, evidence of the charges the Ombudsman described.
For the two most recent funding years, the flood-category status mix is:
| Year | Status | Projects | Value (₱B) |
|---|---|---|---|
| 2025 | On-Going | 2,615 | 175.94 |
| 2025 | For Procurement | 420 | 0.00 |
| 2025 | Completed | 340 | 14.33 |
| 2025 | Not Yet Started | 66 | 4.44 |
| 2024 | On-Going | 1,852 | 155.19 |
| 2024 | Completed | 881 | 67.62 |
| 2024 | For Procurement | 456 | 0.00 |
| 2024 | Not Yet Started | 24 | 1.92 |
| 2024 | Terminated | 2 | 0.00 |
Recent flood-control rows lean heavily on-going. That does not mean they are the projects named in any of the 79 cases. It does mean anyone following the Ombudsman headlines can open recent-year flood contracts and see how many are still open on paper.
Regional concentration (not an accusation)
Flood-category recorded value is uneven across regions. The largest shares in this refresh:
| Region | Flood-category projects | Recorded value (₱B) |
|---|---|---|
| Region III | 3,800 | 169.92 |
| National Capital Region | 2,877 | 107.18 |
| Region V | 2,036 | 106.19 |
| Region IV-A | 2,640 | 94.45 |
| Region I | 2,662 | 70.07 |
| Region IV-B | 977 | 63.54 |
| Region VIII | 1,424 | 53.43 |
| Region II | 998 | 49.40 |
A high regional total means more flood-control contract value was recorded there. It is not a ranking of Ombudsman cases, and we do not map the 79 filings onto these regions from the news reports alone. Geography here is the geography of the contract file. Readers can drill from the map or place pages without treating a region's spend as a charge sheet.
Published indicators on this site
This site publishes rule-based indicators after human review. They are not Ombudsman findings and they are not court judgments. They mark patterns in the records that are worth a closer look. Across the whole site there are 3,883 published indicators. Rules most relevant to flood-control contract structure and delivery:
| Rule | Title | What it looks for | Published flags |
|---|---|---|---|
| C3 | Duplicate or Near-Duplicate Projects | Very similar titles at nearby locations or shared coordinates | 1,183 |
| C5 | Pattern Consistent with Contract Splitting | Clusters of similar contracts just under a ₱50 million threshold in a short window | 438 |
| C4 | Schedule / Date Inconsistencies | Completion before start, implausibly short duration for cost, or future dates marked complete | 283 |
| C2 | Location Could Not Be Confirmed | Recorded coordinates that do not line up with the stated place | 1,013 |
| C7 | High Concurrent Workload for One Contractor | One contractor linked to far more concurrent flood-control value than peers | 46 |
| A1 | Awards Very Close to the Budget Ceiling | Awards at or near the approved budget ceiling versus peers | 373 |
Flood-related examples a reader can open (each returned HTTP 200 at publish time):
- Slope protection along C-6 Open Channel, Phase 1, Taguig · contract 24OB0187 · about ₱141.81 million · Schedule / Date Inconsistencies.
- Flood mitigation along Pampanga River, Palayan City, Nueva Ecija · contract 24CF0007 · about ₱69.00 million · same schedule rule.
- Flood control and drainage package along Magat-related works, Nueva Vizcaya · contract 24BI0008 · about ₱144.75 million · same schedule rule.
- Flood control structure, Imbang River, Silay City · contract 24GK0012 · about ₱96.50 million · Duplicate or Near-Duplicate Projects.
- Flood control project upstream of Dangoan Bridge 1, Medina, Misamis Oriental · contract 23KK0106 · about ₱49.00 million · Duplicate or Near-Duplicate Projects.
- Flood control dike along Bulatukan River · contract 24MC0032 · about ₱48.75 million · Pattern Consistent with Contract Splitting.
- Flood control structure, Laoag River Basin · contract 22A00281 · about ₱48.25 million · Pattern Consistent with Contract Splitting.
- Flood control and drainage along Magat River, Tuao North · contract 24BI0057 · about ₱91.67 million · Location Could Not Be Confirmed.
Workload indicators look at capacity strain — many projects or very high concurrent flood-control value for one contractor versus peers. Published examples (contractor pages, not personal accusations):
- ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP · High Concurrent Workload for One Contractor.
- LEGACY CONST CORP · High Concurrent Workload for One Contractor.
High workload is an operational-risk signal in the award file. It is not proof that any linked project is among the 79 cases, and it is not a finding of wrongdoing.
Duplicates, near-threshold clusters and odd dates matter for a court-and-records story because fragmented or hard-to-locate packages are harder for the public — and for oversight bodies — to follow. An indicator says "look closer." It does not say "this is one of the 79."
How to read this without accusing anyone
- Ombudsman filings are the Ombudsman's. News figures above are attributed to GMA News and the Inquirer summarizing the November 6 briefing.
- Our tables describe fields in public contract records — status, dates, progress, region, published indicators. They are not a judgment on any official or contractor.
- We do not name individuals as respondents. Role counts are counts only.
- A past-target on-going row can mean delay, suspension, idle work or a stale target date. A 100% progress row still labelled on-going can mean a posting lag. A duplicate title can mean phased works or a data-entry twin. Innocent explanations are always on the table.
- A published indicator is worth a closer look. It is not an accusation or a finding of wrongdoing.
- Single-record amounts of ₱10 billion or more are held for verification under our standards and are not used as headline figures here. News-attributed Ombudsman aggregates are cited with the outlet.
Right of reply
The Office of the Ombudsman, DPWH and its regional and district engineering offices, any contractor named on a linked indicator page, and any person who believes a record or indicator on this site is wrong can send corrections or context through our submission page. We will update this article and note the change.
Indicator worth a closer look. Not an accusation or a finding of wrongdoing.
Related flags on this site
- Slope protection along C-6 Open Channel, Phase 1, Taguig · Schedule / Date Inconsistencies. Implausibly short recorded duration for cost.
- Flood mitigation along Pampanga River, Palayan City · Schedule / Date Inconsistencies.
- Flood control and drainage package, Nueva Vizcaya · Schedule / Date Inconsistencies.
- Flood control structure, Imbang River, Silay City · Duplicate or Near-Duplicate Projects.
- Flood control project, Medina, Misamis Oriental · Duplicate or Near-Duplicate Projects.
- Flood control dike along Bulatukan River · Pattern Consistent with Contract Splitting.
- Flood control structure, Laoag River Basin · Pattern Consistent with Contract Splitting.
- Flood control and drainage along Magat River, Tuao North · Location Could Not Be Confirmed.
Data as of November 7, 2026 (Asia/Manila). News reports as of November 6, 2026. Contract and flag counts from the live Love the Philippines database.
Sources
- GMA News: Ombudsman: 79 flood control-related cases filed in courts (Nov. 6, 2026)
- Inquirer: Ombudsman: 4 more lawmakers face flood control preliminary probe (Nov. 6, 2026)
- Love the Philippines methodology
- Love the Philippines indicators
- Earlier on this site: Flood control by the numbers
- Earlier on this site: COA delayed and defective DPWH projects
- News standards