Flood Control and Drainage19IA0057

CONSTRUCTION OF MOOG FLOOD CONTROL STRUCTURES ALONG BILIRAN CIRCUMFERENTIAL ROAD, (124.44944, 11.8806 TO 124.449212, 11.489301)

CONSTRUCTION OF MOOG FLOOD CONTROL STRUCTURES ALONG BILIRAN CIRCUMFERENTIAL ROAD, (124.44944, 11.8806 TO 124.449212, 11.489301) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱28,461,500.00. Status: Reported complete (DPWH). Contractor on record: L M BALTONADO CONST. Figures trace to dpwh.

Biliran DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-BMB-D-19-0021677 · ₱42,041,886 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19IA0057 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-03-28 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Biliran

Based on the coordinates published with the DPWH record and NOAH file Biliran.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MOOG FLOOD CONTROL STRUCTURES ALONG BILIRAN   CIRCUMFERENTIAL ROAD, (124.44944, 11.8806 TO 124.449212, 11.489301)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-19-0021677

₱42,041,886.00 · FY2019

Released to General Headquarters - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

25 projects · ₱445.0M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF ALMERIA BYPASS ROAD, INCLUDING ROW, BRIDGE AND SLOPE PROTECTION, POBLACION ALMERIA, BILIRAN (FROM 11.62732',124.37993 TO 11.62752',124.37986)

Biliran DEO, Region VIII

2018₱83.1M
Reported complete (DPWH)
No sat.

BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN

Region VIII, Region VIII

2020₱64.6M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION - REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS KO159+288 - KO159+351, KO173+957 - KO174+029, KO198+251 - KO198+355, KO205+370 - KO206+000, ALICIA-GUINDULMAN-JAGNA-GARCIA HERNANDEZ, BOHOL

Bohol 3rd DEO, Region VII

2020₱36.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN - JAGNA) KO173 + 200 -KO174 + 030, KO181 + 972 - KO182 + 615, KO182 + 681 -

Bohol 3rd DEO, Region VII

2020₱34.3M
Reported complete (DPWH)
No sat.

IMPROVEMENT OF ACCESS ROAD LEADING TO ULAN-ULAN FALLS (11.61369°, 124.4228° TO 11.61806°, 124.42964°), BRGY. SAMPAO, ALMERIA, BILIRAN

Biliran DEO, Region VIII

2019₱28.0M
Reported complete (DPWH)
No sat.

WIDENING OF PERMANENT BRIDGE - LOOC BRIDGE (B00035BR) ALONG BILIRAN CIRCUMFERENTIAL ROAD (FROM 11.62732, 124.37993 - 11.62752, 124.37986) K1035+129, LOOC, ALMERIA, PROVINCE OF BILIRAN

Biliran DEO, Region VIII

2018₱21.9M
Reported complete (DPWH)
View all 25 projects →

4. Implementation

Contract Amount

₱28,461,500.00

Progress

Reported complete (DPWH)

Start Date

July 7, 2019

Target End

March 7, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF MOOG FLOOD CONTROL STRUCTURES ALONG BILIRAN CIRCUMFERENTIAL ROAD, (124.44944, 11.8806 TO 124.449212, 11.489301).” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/00d83c33-c395-4f00-bf01-59af410931a6

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)BiliranBiliranBurabod
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.